ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (CoolWill), 23 guests, and 16 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Oct 2000
Posts: 3,682
Likes: 3
Admin Offline OP
Administrator
Member
[Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]

(continued because of 8 photo limit)

Joined: Oct 2000
Posts: 3,682
Likes: 3
Admin Offline OP
Administrator
Member
[Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]
Quote
These photos come from a grocery stores electric rooms.

I went there for a service call, I have been to more than 30 of this chains stores and they are all more or less the same.

Not one of the other ones has the drip pans this one does.

Photos 1 and 2 are of the same gear and you can see the 12"x12" can I had to work in, it is clear in photo 1 and barely visible in photo 2 to the right of the trough.

Photos 3, 4, and 5 are of some gear located in another equipment room.

Photo 4 you can see the refrigeration contractor ran parallel to the gear as the prints for these stores always show, the stores engineers know about space requirements.

Photo 5 you can see a plumbing vent, the plans would not have it located there, we would have caught that early and had it moved.

Photos 6, 7 and 8 are all taken from the same direction at a wall with energy management controls and electric defrost control panels (the blue cabinets)

Photo 6 shows a water line that is more than 3' feet from the wall.

Photo 7 You can get an idea of the working space for the defrost panels, these are full of contactors and fuses operating at 208 volt.

Photo 8 You say you might want to open this piece of trough?

Photo 9 again the only pipe even near is at least 6' away.

Note the labor involved here with all the penetrations sealed.

Bob (iwire)

Joined: Jan 2003
Posts: 4,391
I
Moderator
Bump


Bob Badger
Construction & Maintenance Electrician
Massachusetts
Joined: Jun 2005
Posts: 91
G
Member
You think it was required by the local AHJ in this one supermarket?


-George
Joined: Jun 2004
Posts: 1,273
T
Member
Within the grocery industry it is normal for the chain to purchase all of the major equipment and light fixtures directly from the manufacturer.

Once the inspector started to kick the grocer used its buying power to have a sheet metal firm bang out a solution pronto.

Each day of delay costs the grocer about $20,000 in lost gross profit.

With such economics they'd rather fix than fight, and they'd want it fixed overnight.

One new grocery store made the painters so happy: three different color schemes applied over 96 hours round the clock to satisfy the CEO.

I saw a theater change its color scheme three times in three days. But delay the opening: no way.


Tesla
Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
Bob:
Only place I remember anything like this.....Jersey City, NJ

Jersey Journal Newspaper offit (then). One service in basement, actually under sidwwalk, had a 4" drip pan over top of all the gear. Drain pipes down to sump pumps.

John


John

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5