ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 258 guests, and 16 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#105850 09/01/05 02:03 PM
Joined: Oct 2000
Posts: 2,749
Member
[Linked Image]


Joe Tedesco, NEC Consultant
Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Joined: Oct 2004
Posts: 806
Member
As a matter of opinion only, I'd say no. Based on the location (wet pit of wastewater treatment plant?) and other than the open enclosure which looks like work is in progress, the equipment looks to be in good condition. Surface rust and some corrosion of the ep switches, but no obvious serious rot.

A good cleaning and touchup paint and good to go.


Stupid should be painful.
Joined: Jan 2005
Posts: 5,445
Likes: 2
Cat Servant
Member
The operator is blocking our view, but I think the conduit goes to the open box by his right knee.
I believe the square box with the round opening is an "explosion proof" junction box. As such, it really ought to be closed.
If I am right, then this is a good example of a maintenance issue.

Joined: Feb 2005
Posts: 693
L
Member
My first thought was that box is a meter base.


Larry Fine
Fine Electric Co.
fineelectricco.com
Joined: Mar 2001
Posts: 2,056
R
Member
We used to issue a "hot work" permit before opening an E-P enclosure. Even though the circuit itself was not "hot"
The area was "sniffed" to detect flammable vapors and an alarm was set in case a release of vapors occured during the work.

Check these out...
http://www.crouse-hinds.com/crousehinds/pdf/CH62318A-0217.pdf