ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
2 members (Scott35, gfretwell), 275 guests, and 12 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
#98902 06/22/06 07:06 PM
Joined: Jan 2004
Posts: 1,507
G
Member
What is the burial depth for EMT? Assume it has the proper corrision protection.


George Little
Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

#98903 06/22/06 07:10 PM
Joined: Jan 2003
Posts: 4,391
I
Moderator
Darn it all George, can't you ask a simple question at least once in a while? [Linked Image]


Bob


Bob Badger
Construction & Maintenance Electrician
Massachusetts
#98904 06/22/06 07:13 PM
Joined: Jan 2004
Posts: 1,507
G
Member
That wouldn't be any fun Bob. Got these contractors asking me these wierd questions and I like to share [Linked Image]


George Little
#98905 06/22/06 07:21 PM
Joined: Jan 2003
Posts: 4,391
I
Moderator
George you know I am kidding, I like the questions you bring us.

I am going to take door number...er column number 3 of Table 300.5 "or Other Approved Raceways"

Don't know if I am right but it appears the only option.

Bob


Bob Badger
Construction & Maintenance Electrician
Massachusetts
#98906 06/22/06 08:46 PM
Joined: Jan 2005
Posts: 5,445
Likes: 2
Cat Servant
Member
EMT...under what?

Corrosion protection is a BIG "if." That said.... and bear with me, I am going by practical experience and NOT code here...these would be my "EMT rules:"

1) First foot into ground gets pipe wrap;
2) Passing under sidewalk or slab, at least 4" below either (so the concrete saw misses it);
3) Area totally unsuitable for walking over, due to landscaping, etc,... at least below the irrigation pipes; and
4) Under anything even vaguely resembling a road or parking lot, 2 ft!; and, finally-
5) Always totally inadequate for supporting any box, anywhere. Better make a frame from strut.

#98907 06/22/06 09:41 PM
Joined: Jun 2005
Posts: 821
S
Member
George, you have licensed elecricians ask you how deep EMT has to buried?

#98908 06/23/06 01:53 AM
Joined: Jul 2004
Posts: 9,923
Likes: 32
G
Member
I have never seen EMT corrosion protection I "judged suitable for the condition." of being buried in Florida. I have dug up EMT that was in the ground less than 5 years and it was a rusty trail of sand with THWN in it.
The only reason you would know it was EMT was the zinc connectors. We do have pretty salty ground water tho, typically 5 PPT or so, west of 41.


Greg Fretwell
#98909 06/23/06 11:24 AM
Joined: Apr 2005
Posts: 73
D
Member
358.10 Uses Permitted.

(A) Exposed and Concealed. The use of EMT shall be permitted for both exposed and concealed work.

(B) Corrosion Protection. Ferrous or nonferrous EMT, elbows, couplings, and fittings shall be permitted to be installed in concrete, in direct contact with the earth, or in areas subject to severe corrosive influences where protected by corrosion protection and judged suitable for the condition.

(C) Wet Locations. All supports, bolts, straps, screws, and so forth shall be of corrosion-resistant materials or protected against corrosion by corrosion-resistant materials.

Where does it say anything about having to be buried? I can be run along the top of the ground if it is suitable for the condition. Like where outside wall or foundation meets the finished grade. Maybe 1/2" lower if you don't want it visible.

Now if you'll tell us what this is being used for maybe we can provide a good answer.

You'll notice I said we, Not I.

#98910 06/24/06 04:29 PM
Joined: Jul 2002
Posts: 103
J
jes Offline
Member
George, I would say Table 300.5 column 3 or 4 depending on the location, and that all other 300.5 requirements are met. This link also provides some info re the subject of corrosion protection for EMT:
http://www.steelconduit.org/pdf/ConGuide.pdf

#98911 06/26/06 10:00 PM
Joined: Feb 2001
Posts: 308
S
Member
dlhoule--You make a very good point, but you cannot bury anything a half inch below the ground. Once something is 'direct-buried' (as opposed to indirect-buried) 300.5(A) kicks in and the appropriate depth for the situation kicks in. Unless under a building, the minimum depth would be 4".

What makes me wonder is that service conductors that are buried less than 18" below grade do not need a warning ribbon, but 18" or more does. What sense does that make? 300.5(D)--Protect the person digging a large hole, but the poor gardener can get fried?

Page 1 of 2 1 2

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5