Welcome Rknikko and Cpal.
Actually the wording in the 99 NEC made it Mandatory starting on 1-1-02 even if your local stayed under the 99 code.
The difference was, if you were staying with the 99 code, only Receptacle outlets were required to be protected.
Roger
[This message has been edited by Roger (edited 06-24-2004).]