ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 205 guests, and 28 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Mar 2003
Posts: 849
Y
Member
Art:517
517.1 --517.2---517.10---517.45

The Hemodialysis area comes under 517 essential lighting and redundant grounding , either battery back up or Generator. The exam areas Redundant grounding, general purpose area outlets(not a patient bed area),Exam rms exit corridors battery back up lgts.
This is the way I see it also per article in I.A.E.I. Jan./Feb 1993.
Enought power and lights to finish the task at hand and safelty exit the building. Also theres an X ray room, em(battery ok) lgts and redundant grounding. I have a eng, telling us only hemodialysis area comes under essential lighting. Like to know how other Inspectors enforce this in the code.

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Joined: Apr 2002
Posts: 2,527
B
Moderator
You might review IEEE Std 602-1996 {White Book}

TOC only at: http://standards.ieee.org/colorbooks/sampler/Whitebook.pdf