ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 376 guests, and 7 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#216082 09/28/15 09:35 PM
Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
Question:

Does any jurisdiction require an Electrical Permit to be pulled when a home (or other structure) is being re-sided??

Opinions:

Should an Electrical Permit be required??


I'll post a few pics in a couple of days.



John
Joined: Jul 2004
Posts: 9,928
Likes: 34
G
Member
Maybe they might if they were disturbing the service or taking some outside outlets apart.
You probably want the service cut if they are moving the SE cables and Meter base to put siding under it.
I also know it gets done hot but that is just scary, particularly if this is the old style paper and asphalt SE cable that will be crumbling when you touch it by now.
We have an AHJ here who wants permits for device replacements (switches and receptacles)


Greg Fretwell
Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
It's amazing what I come upon, even though the local POCO (PSE&G) will unlock the meter pan, and remove the screws.

Recently, I got a call from a POCO Inspector; 16 meters pulled off in a townhouse development, for a siding job. I was not a pretty site. Same for the HVAC discos and the exterior outlets and lights.




John
Joined: Jan 2005
Posts: 5,445
Likes: 3
Cat Servant
Member
I see an ad campaign in the making:

"Cheapskate Siding did this work:
(Large Picture)

But, not to worry; We at XYZ made it all good!"

Might be interesting to see how much Cheapskate will pay for you to take the ads down. Heck, they might even hire a real pro to clean up their jobs, on a regular basis.

NOW THERE'S AN IDEA. Visit Cheapskate first, and pitch your services to them. Maybe even see proofs of the ad copy. Heck, they may see the error of their ways.

"I see the beginning of a beautiful friendship."

Joined: Jul 2004
Posts: 9,928
Likes: 34
G
Member
When they are disturbing equipment that required a permit to install originally, they should have a permit to put it back.


Greg Fretwell
Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
I agree with that Greg.

I'm thinking about sending a letter to the 'powers that be' (State) to address this within the UCC.

Presently, the Building inspectors visually 'check' to see if the service/meter are "secured" when they do the siding inspection.

IMHO, that is above/beyond their scope.



John

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5