triple,
In may area (N. Calif.), the builder is responsible for providing conduit for service lateral conductors (between xfrmr and meter). The utility co pulls in their conductors.
And in PG&E and SMUD territory, yes, a water line can share the trench with the power. Has to be 24" of separation.
Cliff