ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
UL 508A SPACING
by ale348 - 03/29/24 01:09 AM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (ale348), 302 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Feb 2001
Posts: 54
T
tajoch Offline OP
Member
We have alot of out dated and Tx redneck power installs in my facility, but the one that makes me question just what they're thinking, is that it's the maintenance policy that they are now (get this) you have a 480Vac 3ph circuit, going to multiple fuzed disconnects. with a hoffman box, w/ din rail 3 ph circuit breakers. Because, (So I was told) it's cheaper then buying and installing an actual 480V ckt brkr panel.
I was in a conumdrum, cause I have built a similar type 120v panel in my shop/shed at my house, w/ a few differences, I installed a main on my (homemade) breaker panel, which they aren't doing. I flat out told my boss, (a senior mechanical engineer) that "I couldn't see any city electrical inspector ever approving such a set up, let alone, the fact that the install is limited and self defeating".
While it is a step up, from what was there, it's not a step in the right direction.....
What do Ya'll think of this?

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Joined: Jul 2002
Posts: 717
M
Member
I think it is not listed equipment, therefore not allowed for this particular useage.

Joined: Nov 2002
Posts: 794
Likes: 3
W
Member
I'd think that there would be some libility issues with OSHA regulations (big fines) and insurance companies not paying claims with homemade equipment. It would be, in the long run, cheaper and better to have a licensed EC do the upgrades and have it inspected. Call it "CYA"...

Joined: Jan 2005
Posts: 5,445
Likes: 2
Cat Servant
Member
What you describe is not at all unusual; in several instances I have recieved such panels from the manufacturer of the equipment I'm installing.

Now, that said, listing can be an issue. UL allows panel makers to produce listed panels as "certified panel shops." This is especially important when every panel is a custom panel. UL also has the ability to certify an individual panel- you'ld have to call them for details.

If nothing else, you ought to find out which UL standards apply, and review them. If you can demonstrate that you have considered them in your design, most concerns should be eliminated.

I do find it hard to accept that a home-built panel would be cheaper than one that is produced by a factory, in the thousands. I can't help but feel there is something being left out of the description.

Joined: Feb 2001
Posts: 54
T
tajoch Offline OP
Member
Reno: To clarify the cost issue, I recently talked my boss into having a 3ph 480vac panel installed, to replace some daisey chained disconects. Cost to yank the disconnects, install and wire the panel, $1800.00 In a one shot bill. the cost for building the panel can be carried over a short period of time and just added to the general maintenance charges/funds..... It sounds like legal chicanery to me, and I don't approve, but until he and the other guy retire or get replaced the homemade panels will probably stay the way they are,
I recently talked my boss into buying a quality circuit tracer, and have waded into the process of diagraming the power distribution system of the plant. They were(are) very big into having one circuit breaker at the main feeding upwards of 10 or more dissconects..........
Talk about a mess to troubleshoot, not to mention that they keep talking about all the power issues that we have.........lol