ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 255 guests, and 16 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#9775 05/12/02 10:21 PM
Joined: Aug 2001
Posts: 466
Likes: 1
J
Jim M Offline OP
Member
I just looked at a job at an Army base. They are rehabbing 2900 units. The work involves removal of the old switches, receptacles and replacing them with new and adding GFI's where needed. The ceiling fixtures will also be replaced. All matls are supplied by the base. Cleanup is not part of the work either, just strip, replace and move on.

Any thoughts on a per opening price? The work may get split between contractors. The pay is supposed to be at 30 days.

Any caveats? I already warned them about the possible problem with the luminaires and the old wiring regarding temperature constraints.

This is in MD.

TIA
TIA

#9776 05/13/02 08:04 PM
Joined: Oct 2000
Posts: 5,392
S
Member
are the units similar? perhaps a 'per unit' $$$ ?

oh and, about the fixtures & old wiring, there is to my understanding no 'approved' method ( all pie in da sky aside..) so i just pigtail a few inches of 90deg rx bettween the old wiring & new fixture....

#9777 05/13/02 10:14 PM
Joined: Aug 2001
Posts: 466
Likes: 1
J
Jim M Offline OP
Member
All the units are supposed to be similar. 2 bed, 1 1/2 bath living and kitchen.

My thought is about 12 minutes per device to remove and re-install x no. of devices. Should I bump this up?

#9778 05/13/02 10:28 PM
Joined: Apr 2002
Posts: 914
E
Member
If you base it on 12 minutes per device(switch/receptacle) you should be very safe. We do it in about half that time as long as the wire is in decent shape and post 1960ish and not aluminum or copper clad. Of coarse fixtures or "luminaires" as we now call them, take a little longer.

#9779 05/13/02 10:28 PM
Joined: Aug 2001
Posts: 545
A
Member
You could just charge an hourly rate.


The Golden Rule - "The man with the gold makes the rule"
#9780 05/16/02 02:10 AM
Joined: May 2002
Posts: 68
H
Member
your per opening is not bad but always put in your bid that you are not responsible for any unforeseen wiring that might have to be repaired to make the installs safe or devices that they supply. always protect your self the goverment can be very sticky about any up charges

[This message has been edited by hurk27 (edited 05-16-2002).]


Be Fair, Be Safe
Just don't be Fairly Safe