ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (gfretwell), 32 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#94958 08/20/05 03:22 AM
Joined: May 2003
Posts: 2,876
E
e57 Offline OP
Member
Arch has provided detail for cove lighting of a dining rm.
(Real quick sketch) http://www.markhellerelectric.com/coveq.doc

Anyway, it sitting 6" back, inside a cove with a 3" opening. Personaly I think it a violation of 410.9. What do you think?

Spec for the flexible halogen strip lighting requires 2" clearance bulb to combustables. http://www.ardeelighting.com/downloads/1/clikstrip_catalog.pdf

I figure if the fixture were in a Al excursion track accessory, and wired so it could be taken out of the cove for relamping, or maint. (By leaving a length of conductor behind the fixture) The edge of the track has a lip that could be slid into a notch to help keep the fixture in place with a little pressure.
http://www.markhellerelectric.com/coveq2.doc

Other than a bigger cove, what do you think?

[This message has been edited by e57 (edited 08-20-2005).]

[This message has been edited by e57 (edited 08-20-2005).]


Mark Heller
"Well - I oughta....." -Jackie Gleason
Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

#94959 08/20/05 09:02 PM
Joined: Aug 2001
Posts: 466
Likes: 1
J
Member
Tough call. What is adequate space?

Seems like the cove opening could be taller, or less wide to make relamping easier. Can you ask the Architect if any changes are possible without messing up the effect?

#94960 08/21/05 03:19 PM
Joined: May 2003
Posts: 2,876
E
e57 Offline OP
Member
The tough part is that it is all but fully built! I was off the job for a while, and upon return the GC, was like... "How are you going to install these after I finish putting these parts up?" - "Wow Joe, good point!" We mocked up the cavity, and there is no way to install, or relamp. Unless I train a rat.

As it stands now, I'm thinking I use that track idea, and put a 1/4-20 threaded hole on each side to attach a rod to, as a means to place or remove the track from the cove.


Mark Heller
"Well - I oughta....." -Jackie Gleason
#94961 08/21/05 07:10 PM
Joined: Jul 2004
Posts: 9,923
Likes: 32
G
Member
Has anyone asked the customer what they wanted?
You might have framers and drywall folks in there anyway.


Greg Fretwell