ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (gfretwell), 32 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#94610 08/03/05 06:21 PM
Joined: Dec 2004
Posts: 1,064
D
Member
Single story commercial building.
Undergoing some renovation. Not by us, but by the construction company EC.

Anyway:

Exsisting romex from who knows how long ago, at least 15 yrs?

So why does the electrical inspector come in one day and say, "all this romex has to go".

He wants it all tore out and replaced with mc.

How does this happen?


Dnk......

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

#94611 08/03/05 07:27 PM
Joined: May 2003
Posts: 2,876
E
e57 Offline
Member
They may have local ammendment to code restricting use of NM in commercial. My area does... MC and pipe only!

If it were to existing code at the time of install, he should not be asking for it to be removed.


Mark Heller
"Well - I oughta....." -Jackie Gleason
#94612 08/03/05 07:33 PM
Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
DNK:
What is the occupancy of the new tenant??
Medical??
Is the new 'use' using a plenum ceiling?

If it was 'to code' when installed, then it should be able to stay.

John


John
#94613 08/03/05 08:04 PM
Joined: Feb 2005
Posts: 361
C
Member
Another question need to be answered:


What percentage of the property is under going the renovation?
Some jurisdictions require full compliance with active code after 50% renovation.


~~ CELTIC ~~
...-= NJ =-...
#94614 08/03/05 08:18 PM
Joined: Dec 2004
Posts: 1,064
D
Member
To answer some of your replies:

1. maybe 10% of the building being retrofitted.
2. No medical use at all, renovating being done to make old cubicle area into offices for new engineering staff. New walls, dividers and such.
3. Same ole tennant, been in the building for as long as I can remmember.
4. All new ac unit trunks being pu in, same ac units though, no plenum cieling that I know about.


I have no clue how he can justify this, like I said this was an electrical inspector, not a building inspector or fire marshall.

Dnk.....

#94615 08/04/05 03:43 PM
Joined: Dec 2004
Posts: 1,064
D
Member
And the answer is:

Exsisting romex above a drop must come out. All of it.

Romex in walls can stay, then go to j-box and then mc above the drop cieling.

Anyone have a code reference for this?


Dnk.......

#94616 08/05/05 02:33 PM
Joined: Dec 2004
Posts: 1,064
D
Member
FYI

Talked to inspector, because only 10% is being renovated now, permit that was pulled calls for over 50% of the building to be renovated. Work is being done in phases, rather than all at once, therefore romex must come out.

Dnk........

#94617 08/06/05 04:19 AM
Joined: Feb 2003
Posts: 27
W
Member
Question where is this one story commerical building? Is it in a fire zone? It could be a local code requirement. And possibly the original wiring in non-metallic sheath cable was not inspected or had a permit so the EC now has to straighten this problem out.


William Runkle
#94618 08/06/05 06:34 AM
Joined: Mar 2002
Posts: 582
R
Ron Offline
Member
Code reference is NEC 2002 334.12(A)(1)