ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 255 guests, and 16 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Jun 2002
Posts: 186
M
mj Offline OP
Member
guys, I need help with this ons... given a large multifamliy dwelling unit has (2) services, The building has a (2)hour rated party wall halfway the building, this is not a true fire wall, therefore this is considered to be one building. my question is to comply with 250.58, to have a single grounding system, Can the bonding jumper that connects service #1 to service #2 be routed through the attic of the the building ? thanks, mj

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Joined: May 2002
Posts: 1,716
R
Member
Mj, there is nothing prohibiting running through the attic as far as the NEC is concerned, there could possibly be a local code though.

Just be sure to use a proper "through penetration assembly" (fire cauking) when going through the rated wall.

Roger

Joined: Jun 2002
Posts: 186
M
mj Offline OP
Member
thanks Roger, I have a contractor that do not understand the purpose of 250.58 since the slap in already in, I was going to suggest routing the bonding jumper through the attic to create a single grounding electrode system.

Joined: Jun 2002
Posts: 186
M
mj Offline OP
Member
need help guys.... any more details to support sec# 250.58, commom gronding electrode where there are multiple services on one building ? I have a board meeting soon, and I need to prove my case for requiring the bonding of electrodes for all services. thanks, mj

Joined: Jun 2002
Posts: 186
M
mj Offline OP
Member
does any kwows how long this requirment has been required in the nec .... "common gronding electrode,Sec # 250.58 " I had one inspector stated that it was not required in the 1990 nec.