ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 466 guests, and 10 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 3 of 3 1 2 3
Joined: Apr 2001
Posts: 507
G
Member
"GJ that is for sizing the box when using cables no raceways"

Was the wording changed from '99 to the '02 code? I'm sure that the AHJ here in Nebraska was allowing boxes sized on conductor size a while back.

GJ

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Joined: Oct 2001
Posts: 172
W
Member
The Nebraska inspector must be a cousin of the one that sizes pull boxes based on the cubic inch formula. There are inspectors out there that are human and don't know everything about the NEC. I have been in the trade almost 23 years and believe it or not I still learn something new about the code on an almost daily basis. Lately a good bit of that is thanks to you guys here at ECN.

Joined: Apr 2001
Posts: 507
G
Member
"There are inspectors out there that are human"

Hey, let's not be starting that rumor!