ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Safety at heights?
by gfretwell - 04/23/24 03:03 PM
Old low volt E10 sockets - supplier or alternative
by gfretwell - 04/21/24 11:20 AM
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 228 guests, and 10 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 3 of 3 1 2 3
Joined: Nov 2000
Posts: 2,148
R
Member
Pierre,
Those are both disconnects and are permitted by the code. The controller is the relay or control board within the furnace equipment.
Don


Don(resqcapt19)
Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Joined: Jun 2002
Posts: 15
E
Member
"The 3 or 4 way switches would actually be motor controllers and each of these switches would require a disconnect per 430.102(A)."

What about 430.111 ?

Joined: Nov 2000
Posts: 2,148
R
Member
engy,
I forgot about that one.
don


Don(resqcapt19)
Joined: Aug 2002
Posts: 1,081
T
Member
Thanks, iwire -- I was trying to find that.