ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Safety at heights?
by gfretwell - 04/23/24 03:03 PM
Old low volt E10 sockets - supplier or alternative
by gfretwell - 04/21/24 11:20 AM
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 516 guests, and 17 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 3 of 3 1 2 3
Joined: Jan 2003
Posts: 4,391
I
Moderator
Bill,
Same thing here in MA the building inspector is last, I imagine to see what damage the trades have done to the structure and insulation as the building inspector verifies energy code compliance here.

As to who seals the holes, we try to negotiate that out of contracts (along with anything else that is not directly electrical) but often we end up doing the sealing.


Bob Badger
Construction & Maintenance Electrician
Massachusetts
Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Joined: Oct 2000
Posts: 4,116
Likes: 4
Member
The way that I've seen it happen is:

Framing Inspection (no Trades in yet)
Rough-in Electrical (maybe Plumbing too)
Insulation Inspection (after Insulation is in)
Finals (any order)

Bill


Bill
Joined: Feb 2003
Posts: 67
P
Member
around here all inspectors are required to be combination inspectors.we do framing,plumbing,electrical,and mechanical in the same day.i think most building departments prefer the multi-purpose inspectors and we will become the norm.

Joined: Feb 2001
Posts: 308
S
Member
Fire-caulking is required for any spaces that are required to maintain a certain rating such as between floor. This means around any space around any type of penetration. Large spaces are allowed to use Rocksul ( I think thats the spelling) which is basically a fiberglass insulation. Properly rated caulk as listed by UL as suitable for the purpose doesn't breakdown when it gets hot and stays pliable so expansion and contraction of penetrations do not create additional gaps.

The proper caulk around here is about 15 bucks a tube.