ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Safety at heights?
by gfretwell - 04/23/24 03:03 PM
Old low volt E10 sockets - supplier or alternative
by gfretwell - 04/21/24 11:20 AM
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 235 guests, and 27 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 3 of 3 1 2 3
#82189 10/26/02 04:53 PM
Joined: Oct 2002
Posts: 210
S
Member
Your GC does not sound like a guy I would like to work for.

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

#82190 11/01/02 01:56 PM
Joined: Apr 2002
Posts: 197
T
Member
Nick, what are these metal plates you speak of? Are they "home-made" or an available product from a distributor? Also, I assume the ears must be cut off the devices to avoid interference with the sheetrock. So if the edge of the sheetrock does not line up exactly flush with the box, won't you have a "fit and finish" problem come trim-out?

#82191 11/01/02 06:27 PM
Joined: Jan 2002
Posts: 1,457
E
Member
There is another product available for this situation. I can't remember the name but I have some in the truck. "Device leveler" or something like that. I'll check into it and see what I find.

#82192 11/02/02 11:09 AM
Joined: Mar 2001
Posts: 345
T
Member
On one building I had a lot of trouble on the first floor with cut wires so I installed utility box blank covers on all of the plaster rings. I tried the three different brands available and found one that fit really well. When I had complained about the damaged conductors on the first floor the GC had pointed out some boiler plate language in the specs that required all crafts to protect work in place. I showed the GC the new technique and assured him that I had photographs of the covers in place. I told him that the dry wall guys could not remove my covers without his accepting responsibility for the work. When he told the dry wall guys that they could not remove the covers they tried to jack him up for more money and he threw them off the job. When the new dry wall crew arrived they were greeted by signs that said "Danger All wiring under stress test. 277 VOLTS. Do not tamper. I had no problem with the new crew.
--
Tom


Tom Horne

"This alternating current stuff is just a fad. It is much too dangerous for general use" Thomas Alva Edison
#82193 11/02/02 05:31 PM
Joined: Jan 2002
Posts: 1,457
E
Member
Every day is a stress test. Good idea with the covers.

#82194 11/02/02 09:20 PM
Joined: Aug 2001
Posts: 599
N
Member
The covers are made by our prefab department. Yes, the ears have to be cut off so the box has to be mounted very secure. Kick plates with the brackets that push against the other side of the wall work best.

Page 3 of 3 1 2 3

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5