ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 255 guests, and 15 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#80072 02/19/02 03:52 PM
Joined: Feb 2002
Posts: 1
S
Junior Member
What code in NEC covers adding a generator receptical to a pump control panel, where the main power source is from the pole (the generator is backup)? Does the generator need a transfer switch to prevent accidental shorting to the pole power per the code?

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

#80073 02/19/02 04:49 PM
Joined: Jan 2001
Posts: 1,044
Tom Offline
Member
Try Article 702 Optional Standby Systems. You will need some type of transfer equipment.

Also, every electric utility that I've ever dealt with has a requirement regarding this. It would be best if you checked with them to see what their requirements are.

Tom


Few things are harder to put up with than the annoyance of a good example.
#80074 03/02/02 01:05 PM
Joined: Mar 2001
Posts: 345
T
Member
The cheapest way out is to connect the pump controller to the service by cord and plug. This will allow you to just plug it into the cord from the generator.


Tom Horne

"This alternating current stuff is just a fad. It is much too dangerous for general use" Thomas Alva Edison
#80075 03/03/02 08:47 PM
Joined: Nov 2001
Posts: 273
C
Member
all cases say that you should have a double pole double throw switch or an automatic transfer switch. this is to protect power line personel from back feed. which you most likely well be held accountable for. again check with the power supplier.ERWIN