ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 465 guests, and 12 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#78765 10/22/01 09:28 PM
Joined: Nov 2000
Posts: 2
H
hotwire Offline OP
Junior Member
A outside wall mounted 100amp 3meter/breaker-combo from a
gas meter, replacement for single meter serving 3 apartments

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

#78766 10/22/01 10:25 PM
Joined: Aug 2001
Posts: 599
N
Member
Table 110-26(a)
What is the voltage to ground?
Assuming 120V- 3ft deep by 30inch wide or the width of the equipment, which ever is wider.

#78767 10/22/01 11:38 PM
Joined: Oct 2000
Posts: 4,116
Likes: 4
Member
Hotwire,

Where I am there must be a 12 inch clearance from the Gas. You should ask your local utility what they require.

Bill


Bill

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5