ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 260 guests, and 19 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#71853 11/08/06 01:06 AM
Joined: Jul 2006
Posts: 272
L
Member
Hello to all,

Noticed something today here at the plant. A run of 3" ridgid coming from a mcc to a 130hp motor goes through a hole in an I beam then ninetys up to the motor itself. There is a nice weld bead that circumfrences the conduit. Looks like a violation of 300.18 (B). In this paragraph though, it goes on to state the following:

"unless otherwise specifically designed to be or otherwise specifically permitted to be in this code"

Would the "specifically designed" statement be refering to an engineering design call that might have been made to allow this type of install to happen?

Luke

[This message has been edited by Luketrician (edited 11-08-2006).]


Luke Clarke
Electrical Planner for TVA.

#71854 11/08/06 07:56 AM
Joined: Jan 2003
Posts: 4,391
I
Moderator
In my opinion that section requires that the section of raceway be specifically designed by it's manufacturer for weld mounting.

A bulkhead fitting would be an example of a raceway section that might be specifically designed for welding.


Bob Badger
Construction & Maintenance Electrician
Massachusetts
#71855 11/08/06 08:03 AM
Joined: Jul 2004
Posts: 787
L
Member
I thought the NEC doesn't apply to power generation facilities. Plus, I bet the local electrical inspector hasn't been allowed in.

Larry C

#71856 11/08/06 12:45 PM
Joined: Mar 2005
Posts: 1,213
S
Member
RC is a steel pipe, it's inherently weldable. Why would there be any problems welding it to structure?

#71857 11/08/06 01:05 PM
Joined: Jan 2003
Posts: 4,391
I
Moderator
Because the code says so? [Linked Image]

Perhaps it's the fact welding tends to remove the required corrosion protection?

Or that improper welding techniques could lead to slag / sharp edges inside the raceway?

I don't have a real answer Steve but to look at another way is why should I weld it when there are so many products designed to support ridge pipe?

Bob


Bob Badger
Construction & Maintenance Electrician
Massachusetts
#71858 11/08/06 03:00 PM
Joined: Nov 2002
Posts: 794
Likes: 3
W
Member
Quote
Why would there be any problems welding it to structure?

I would hope the welding work was done before the wires were put in it... [Linked Image] Can you say "melted insulation"?

#71859 11/08/06 08:13 PM
Joined: Jul 2006
Posts: 272
L
Member
I think you're right LarryC, It seems to me that the NEC is 'trumped' by the design engineers here at the plant. Is this a good thing?? That question is debateable...

The conduit does have plenty of enamel covering the weld joint though. No rust is visible. I would snap a few pictures for the forum, BUT..I might get into some trouble if I start taking pictures of 'vital' plant equipment.

Wondering about the statement "specificaly designed by it's manufacturer for weld mounting", the hole looks to have been made with a cutting torch, not to pretty. I'll be looking into this further, any more comments would be appreciated, thanks guys & gals. [Linked Image]

Luke


Luke Clarke
Electrical Planner for TVA.