ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 255 guests, and 16 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#69853 09/20/06 10:56 AM
Joined: Sep 2006
Posts: 3
W
wadega Offline OP
Junior Member
does anyone have a rough in and trim out checklist they use to walk thier jobs? If so can i have a copy of them

#69854 09/20/06 06:55 PM
Joined: May 2005
Posts: 706
T
Member
I'm sorry I don't, but if you check off items while looking at a blueprint, you'll have your checklist. It shouldn't take very long.

Dave

#69855 09/20/06 08:20 PM
Joined: Sep 2006
Posts: 98
A
Member
Wade
I have both at my old place and will send you same in a few days. I'm going out there tomorrow and will add that to the list.

#69856 09/21/06 10:03 AM
Joined: Sep 2006
Posts: 3
W
wadega Offline OP
Junior Member
Thanks Almost Fried i would really appreciate those.

#69857 09/21/06 06:29 PM
Joined: Jun 2005
Posts: 821
S
Member
As for new and old work (residential), I make a list like this. I go through each room and list everything I have done. Like this:


Master Bedroom:
7 - duplex receptacles
2 - single pole switches
2 - 3-way switches
1 - Cable TV/ tele combo plate
1 - 3g toggle plate
1 - 1g toggle plate
1 - Ceiling fan
1 - BRK smoke detector

Bedroom #1:
6 duplex receptacles
1 single pole switch (or S1 for short)
1 - ceiling fan
1 - 1g toggle plate

And so on and so forth. This system works well for me and can be written up while the helper cleans up and wraps up the cords. Nothing worse than getting to a job you're expected to finish in one day and have to make an additional trip for one or two lousy plates you forgot to write down on the rough.

#69858 09/22/06 12:14 PM
Joined: Sep 2006
Posts: 3
W
wadega Offline OP
Junior Member
i am looking for more of a job completion checklist for my supervisors and subcontractors. if anyone can help thank you