Safety at heights?
by gfretwell - 04/23/24 03:03 PM
Old low volt E10 sockets - supplier or alternative
by gfretwell - 04/21/24 11:20 AM
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 519 guests, and 18 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 3 1 2 3
#65666 05/10/06 07:26 PM
Joined: Mar 2005
Posts: 212
G
Member
What I don't understand is why one trade (sheetrockers) seem to think that in the normal course of their work it is OK to damage another trades completed work and not be accountable. I know this really doesn't address the issue, just lettin' off steam.

#65667 05/10/06 08:46 PM
Joined: Mar 2002
Posts: 179
D
Member
I leave slack in nearly everything and haven't been flagged yet. Inspectors fairly 'real world' around here.

#65668 05/10/06 10:26 PM
Joined: May 2003
Posts: 2,876
E
e57 Offline
Member
Stick a stacker above or below the box, and put a loop of cable in it. If you need to move, or pull some slack into the box... Give a good tug, and pull the loop out. The code only says that the romex be supported 12" before the box, and it is, when it is installed. After rock, if all goes choppy rocky... The slack you pulled is fished after the finish....

If you don't like the look of a loop, go from one side of the stud bay to the other, and use stackers instead of staples for the same effect.

"I understand the idea but given what my guys' first attempt looks like, I'd be afraid to see what they did the second time around."

Maybe its time for some training, or a good spanking. They do have to learn somehow....


Mark Heller
"Well - I oughta....." -Jackie Gleason
#65669 05/10/06 11:00 PM
Joined: May 2004
Posts: 116
S
Member
e57 -

What is a "stacker"? Is it called anything else?

Steve


Thanks
Steve
#65670 05/11/06 02:46 AM
Joined: Jul 2002
Posts: 717
M
Member
My new policy is going to be a slack loop, with the staple installed right where code calls for. Nick the wire with roto zip and I kick in the wall above the box, losen staple, pull in romex and make up box, walk away, send contractor a bill for the extra work I had to do.

#65671 05/11/06 07:23 AM
Joined: Apr 2005
Posts: 197
L
Member
Back charge the rockers a few times and you'll see how fast they stop doing that.

#65672 05/11/06 07:27 PM
Joined: Jan 2003
Posts: 1,429
L
LK Offline
Member
"Nick the wire with roto zip and I kick in the wall above the box, losen staple, pull in romex and make up box, walk away, send contractor a bill for the extra work I had to do."

Now there is a real solution, to the problem.

#65673 05/11/06 09:52 PM
Joined: Jan 2005
Posts: 109
L
Member
I give the offender the option. You do it or I will. Had a dry waller cover every box on one wall. We had 15 openings. I went to the super then the drywall forman and gave them 24 hrs to work it out. I knew about where the boxes were as I made notes on the as builts. Drywall forman copped an attitude and super was wishy washy. We found the boxes with a 12lb hammer. Super fired, drywall co fired and back charged. Another time Drywall formam worked with us and we only had to fix two out of place holes. If you play nice I play nice,if not I CYA and they lose. Now I carry a dig camera and take lots of pics. Rod

#65674 05/11/06 11:12 PM
Joined: May 2003
Posts: 2,876
E
e57 Offline
Member
A stacker...
[img]http://multimedia.mmm.com/mws/mediawebserver.dyn?6666660Zjcf6lVs6EVs666XdTc7rrrrQ-[/img]

This one is 3M, but others make them too.
They hold snug enough for being fairly undisturbed in a wall, but loose enough that a good tug will pull a cable free of one if set up to do so.

Like the job I was on today, a "Designer" is running it. (Notorious for frequent changes ...) So I had a guy staple to about a foot from the box, then add a small loop of slack above or below, then into a stacker for the final support of the <12" of cable that would continue to the boxes.

I also use these boxes for just about everything.... (Several local supply houses have them as the same price as a regular nail-on.)
[Linked Image from carlon.com]
The screw on the side allows the box to be adjusted for depth, but also allows the box to be removed as well. So you can easily reach in the wall and pull up more wire too.

[This message has been edited by e57 (edited 05-11-2006).]


Mark Heller
"Well - I oughta....." -Jackie Gleason
#65675 05/11/06 11:30 PM
Joined: May 2003
Posts: 2,876
E
e57 Offline
Member
As for buried boxes, I take my own sweet time and trace the circuit with a toner, and poke a bunch of holes with a screwdriver to check. Then charge full rate as T&M as back charge.....

"I think its right here.... (Mash) Nope. Maybe here???? (mash) Nope."


Mark Heller
"Well - I oughta....." -Jackie Gleason