ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Safety at heights?
by gfretwell - 04/23/24 03:03 PM
Old low volt E10 sockets - supplier or alternative
by gfretwell - 04/21/24 11:20 AM
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 235 guests, and 27 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 3 of 3 1 2 3
Joined: Sep 2005
Posts: 421
togol Offline OP
Member
See, maybe 200A is just around the corner.....who can say ;> )

on the other hand if the NEC is really concerned about arcing faults...why not just put the bedroom circuit on a single element cartridge fuse ...maybe 8A forget all the fancy doodads...or require fuses in all corded appliances ?

..hell, fuse the bedroom Neutral while we're at it......is this the dumbest idea ever?


Tom
Joined: Mar 2002
Posts: 179
D
Member
I saw a bumper sticker in D.C. yesterday that covers a lot of situations like this;
" If you make it idiot proof someone will just make a better idiot"

Joined: Jan 2006
Posts: 558
R
Member
Aw geeze this guy is SPUN!!
I really like the part where he is saying to run a 40 or 50 amp circuit using # 6 "but #4 is better" for a string of receptacles??!!?!?!?! I wonder how you would attach said #6 or #4 to a receptacle???!?!?!?!!? Pigtails?? SURE...
( I cant stop laughing!!!)

Hmmm I wonder how then my friend's entire backyard metal / machine shop ran off an old 40A stove feed with #8 cable??? Never a voltage problem, rarely tripped the feeder breaker, rarely being 3x in as many years it was there, and that was only if the lights were all on, the welder was in use, air comp was running and someone started one of the other big pieces of equipment...

Makes me think back to where I was at that Retirement home when our company wired it..
The whole building was engineered and designed by what had to be all the engineers that failed and had a lack common sence, as in our case: " A non north facing photo eye used for control of outdoor lighting will fail to work at ALL" (agreed they work best when pointed north but they will operate pointed elsewhere).. but thats the least of the problems we had. ---->The feed to the kitchen run in 3" pipe with #3 copper conductors fused at 225A were of concern, but according to the engineer " Its ok as I am the engineer and I am always right"..... The list goes on.

A.D

Joined: Nov 2002
Posts: 794
Likes: 3
W
Member
Quote
He says that he is an Electrical Engineer. If his profession is in fact correct, its pretty scary.
[Linked Image] that's my profession! But we are not taught things like electrical codes, or even things about overcurrent fault conditions and other safety issues. We get mostly theory in college. In my job I deal with milliamps or even microamps at 5V DC or lower voltage. Mostly limited energy so arc blasts are rare, and mostly low voltages so shock hazards are also rare. All good reasons why I can't get an electrician's license just by presenting my college BSEE diploma.... Different knowledge and skills needed for that. [Linked Image]

Joined: Feb 2003
Posts: 231
R
Member
wa2ise,
I hear ya. I will rephrase my remark.

If his profession is in fact correct,

"25 years as a professional engineer, practicing electrician, and code inspector in 5 states in the US"

Its still pretty scary! lol

[This message has been edited by RobbieD (edited 02-05-2006).]

Joined: Jul 2004
Posts: 625
S
Member
Quote
If his profession is in fact correct,

"25 years as a professional engineer, practicing electrician, and code inspector in 5 states in the US"

Its still pretty scary!

I wouldn't get too scared just yet. As has already been pointed out, if he's buying 50A AFCIs, he's living in some sort of alternate reality. I understand that in alternate realities it's really easy to get college degrees, experience, girls, whatever you want. Heck, some of them even become dieties!

[This message has been edited by SolarPowered (edited 02-05-2006).]

Joined: Feb 2003
Posts: 231
R
Member
From: decolores9 7:35 am
To: ALL (61 of 61)

33694.61 in reply to 33694.52

Quote-"This discussion seems to be deteriorating into personal attacks and arguing, so I'm not sure it's worth continuing the debate. I don't see any benefit in personal attacks, and don't want to stoop to that level.

However, I think there are some good points that have come out, or at least been hinted at, in this discussion:

1. If you aren't absolutely confident you fully understand NEC and your local amendments, seriously consider consulting an electrician.

2. In most municipalities, all electrical work must be inspected. Often, homeowners are permitted to work on their own homes without an electrician's license, but the work must still be inspected. The inspector is often a great source of information.

3. Get the work inspected. If you don't, you may be subject to fines. In addition, if you have a house fire, the insurance company can deny your claim because you have unpermitted electrical work. (it really does happen - a friend had his house burn to the ground, his insurance company denied coverage because a prior owner had done unpermitted work, unbeknownst to him. The courts upheld the denial). In addition, when you sell the house, many buyers will require copies of your permits and inspections. If you have to have the inspection done after the fact to sell the house, it will cost more and there will likely be fines.

4. Be wary of those who state they are P.E.s, but do not provide a license number, discipline, or comment on whether their post is an engineering report. It's a legal requirement in all 50 states, if one is issuing an engineering report. At least they are not following the legal requirements, and may well not be a P.E.

5. There is often more than one "legal" solution to a given wiring issue. I explained how I wire shops, and while others' attacked my solution, no one has proposed an alternative. I'm sure there are alternative solutions, but have yet to hear any alternatives to the options I proposed, that address the issues present in a shop. What I proposed is NEC compliant and safe, but there are likely other solutions. More importantly, your local inspector may like it, or not. It's best not to "fight" with the inspector - it's better in the long run to make the minor modifications they want to avoid antagonizing them, even if want they want is not required by NEC or local code. It's better to make friends than enemies of inspectors.

6. Use AFCI breakers - conventional breakers do not reliably trip in many cases. The exception, IMHO, would be a shop with a dedicated branch panel in which you turn off the main breaker when you are not in the shop. In that case, conventional breakers are OK - if there is a problem, you will be in the area to manually trip the main before a significant fire can develop. Keep the door to the panel closed, and try to locate the panel away from heavy dust areas, as dust - wood or otherwise - can contribute to the breakers "sticking".

7. Understand the practical wire size and current requirements for motor startup. NEC only requires one wire size larger for motors, but that is insufficient in most cases to prevent the voltage drop on motor startup (that's the primary benefit of using a 40A or 50A branch circuit - it solves the voltage drop and startup surge problems). Remember, too, that the LENGTH of the wire is critical in determining correct wire size. NEC has tables to use as a starting point.

8. Be cautious with any advice you receive on the internet. Many of the self proclaimed experts on this thread have a very flawed understanding of NEC, IMHO. The "majority" comment is often wrong - most people don't understand the subtleties of the NEC, or any other topic for that matter, but that doesn't stop them from attacking those who have a better understanding. Before you act on advice, confirm it with someone locally, whose credentials you can verify and whose authority YOU trust.

9. Use a GFCI in shop circuits - it may save your life one day. A GFCI receptacle will protect downstream receptacles, so it should be the first receptacle (i.e. closest to the circiut breaker). GFCI receptacles can be combined with AFCI breakers.

Thanks. I hope this helps."

LOL- This guy is funny.

Joined: Jan 2006
Posts: 558
R
Member
RobbieD Gee I dunno 'bout him still..

This is my rebuttal to what he has to say, sorry I have to say it and get it off my chest..

--------------------------------------------

In points #2 and 3 about getting your work inspected.. If I wired my shop like how he did his, I am positive the inspector would kill himself LAUGHING while he walked out the door.. And in point #3, where your friends house burned down: did you give your friend some bad advice????.....

Point #5... We all know how to wire a shop properly.. There is no need to state an alternative as there is ONLY one way to do it... The CORRECT way ( weather it be bare minimum, or wired to the hills with extras, its the CORRECT way). You will not make friends with your inspector by wasting his time having him come out and find the whole place a hazard.

Point#6....
Use AFCI's???? Whats wrong with regular breakers??? If regular breakers do not trip "reliably" why do we use them by the millions in our houses to protect the wiring? Standard breakers work FINE! IF they are the right size for the conductor and load applied!
Want to keep them from sticking? Operate the handles once in a while like you are supposed to do to ensure the internals are not all bunged up, But I will agree keep it away from dust.. Common sence says that.. As for that thing about turning off the main when you leave, and being able to "shut the main off before a signifigant fire could develop"
Well if the branch breakers are sized CORRECT there will not be that problem, the breaker will trip!

Point #7: The voltage drop on motor startup.. Well generally one size "up" in wire gauge will work, heck its not going to hurt at all BUT but a 40-50 A branch circuit? FOR WHAT? I understand you need to upsize the conductor depending on its length to prevent voltage drop, but how far are you going in this case? the other side of a woodworking shop or across the street and down the block?? Also the overcurrent size would REMAIN THE SAME not be upgraded to something like 40-50A.. The starting current is MOMENTARY..

Point #8:
" Self Proclaimed Experts"... Well, Yes, Yes we are experts as this is our profession and we are liscensed or are in the process of doing so.. We do our work with pride and to the best of our ability following all codes and regulations to ensure a safe and neat installation or repair...
"Attacking those with a better understanding".... Who?? You? Better understanding of what how to wire a place to burn??? To be so unsafe the inspector is going to laugh himself to death as he walks out of the place?? Sure whatever!!

Point #9

GFCI's and AFCI's are not always compatible!! May seem like they are but not always, have had problems in the past doing this...
--------------------------------------------

Now I don't know guys, something about him saying things like the following really make me wonder about what profession he really is or if he just lacks common sence, or just thinks he hnows everything when in fact he is dangerous. Things said like:

1."40-50A circuit with multiple 20A receptacles"....
2. "Conventiomal breakers do not trip reliably"
3."turning off the main" or being able to "turn off the main before a signifigant fire could develop"...

Does it seem like he is just going in circles here or is this just me, sounds to me like he is saying: " upsize the wire, and the breaker, but have it feed a 20A receptacle, but use an arc fault because regular (read OVERSIZED) breakers will not trip should the motor short out.. OR use conventiomal breakers (read OVERSIZED again) and be present and able to open the main so that if a short develops, you can shut it off before the place burns to the ground, and shut the main off when you are not there in case something happens a fire will not result..."

Sorry people I nneeded a rant and rave today!

A.D

Page 3 of 3 1 2 3

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5