Caselec is 100% right, I think.
Have the plumber provide a cut sheet for the units and make sure the owner or general contractor and you each have a copy.
It's a common practice for the plumber to show up at the job and install something other than what was specified, often because it was in stock at his supplier's.
I've run 40 Amp Circuits to a few. They also come in 277 Volt models.
Just for that little square box.