ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 373 guests, and 12 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#48078 02/03/05 11:49 AM
Joined: May 2003
Posts: 74
J
jkraft Offline OP
Member
My local road commision has purchased a 90KW generator with a 400A automatic transfer switch, suitable for use as service equipment, and wants me to connect it. The building is one of their maintenance garages and has a 2000A service with a 800A main. The supervisor wants me to down size the fuses to 400A saying that's all the service they need. I haven't done an actual load survey yet, but am concerned if the local inspector will even allow this. Any ideas?

#48079 02/03/05 01:10 PM
Joined: Aug 2003
Posts: 1,374
R
Moderator
Do the load calc's and see what you come up with.


Ryan Jackson,
Salt Lake City
#48080 02/03/05 03:49 PM
Joined: Feb 2002
Posts: 182
B
Bob Offline
Member
Why not put a 400 amp fused panel at the generator or on the building and leave things as they are?
Also check with the utility and get the yearly max demand.
What is the voltage?