ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Safety at heights?
by gfretwell - 04/23/24 03:03 PM
Old low volt E10 sockets - supplier or alternative
by gfretwell - 04/21/24 11:20 AM
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 247 guests, and 28 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 2 1 2
Joined: Jan 2004
Posts: 79
C
Member
"I generally just run a continuous GEC from the panel, to one rod, then to the next rod.Leave the wire on the surface, and bury it in a shallow trench after inspection...."
- NJwirenut

Me too. You would have to buy the proper megohmmeter for testing the rods in order to show the inspector that one rod is sufficient...it's much cheaper to just put the second rod in and not even have to be there for the inspection nor buy the test instrument.
Andy

Joined: May 2004
Posts: 162
C
Member
250.50 (2005) does require concrete encased electrodes to be part of the grounding electrode system when there is re-bar in the concrete. But there are exceptions and if the footing and or foundation does not containe such steel it is not necessary to pick it up (unless local codes require it!!)

Charlie

Joined: Jan 2005
Posts: 1
C
Junior Member
We use crimp splices when we have to add a second ground rod.

Page 2 of 2 1 2

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5