ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 255 guests, and 16 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
#44388 11/03/04 08:43 AM
Joined: Jan 2003
Posts: 46
B
Big A Offline OP
Member
Hey All,
Once again I have a homeowner trying to screw me out of some money. This is a job for a "friend" so we all no how that goes. Like an idiot I didn't get a contract and the verble agreement was shady at best. When I gave the homeowner the finished bill she said, "I'm not paying that...It's way to high for what you did."

What I did was to install 7 second floor receptacles on two new 20a circuits. Plaster walls so I cut the new boxes into the base boards and pulled the circuits down from the attic. All is in wall and concealed. My outrageous price?...$120 per.

Outside of not getting them to sign a contract, I'm I way off base here?

#44389 11/03/04 09:57 AM
Joined: Jul 2002
Posts: 8,443
Likes: 3
Member
Big A,
How long did it take for the install?.
Personally, I'd charge a bit more than $120 per outlet!.
I'd be looking for the advice of LK here!.
Where are ya Les?. [Linked Image]

#44390 11/03/04 10:12 AM
Joined: Jan 2002
Posts: 1,457
E
Member
Tough to say without knowing all the circumstances of the job but sounds very reasonable to me.

#44391 11/03/04 12:12 PM
Joined: Feb 2002
Posts: 375
G
Member
I think that $120/outlet would make most people reconsider.

I think your friend would have liked an opportunity to reconsider.

If you want to keep the friend as a friend ask them to pay what they think the work is worth.

#44392 11/03/04 01:32 PM
Joined: Aug 2004
Posts: 54
G
Member
I have to agree with George....if this is a "friend", it probably would've been better to just say, "hey, I'll do this for you, but it's gonna be T&M. my rate is $XX per hour, and I'll work as efficiently as I can, but with this type of work, if I run into problems, it could take a LOT longer."
no offense, but $840 for 7 outlets for a "friend" seems a little steep. If they agree to the T&M, you're at least getting your hourly rate and materials. Maybe you can still figure it out that way for them, and resubmit a new bill to them as a gesture....assuming T&M ends up less? :-)

#44393 11/03/04 02:03 PM
Joined: Jan 2003
Posts: 46
B
Big A Offline OP
Member
Just to clarify. I'm doing the work for the friends of a friend. I tried to bid T&M but they didn't want to go that route. I have about 15 hours into this and $70 material at cost. At $50 an hour plus $90 for material I came to a total of $840. I guess I could knock $50 bucks off to keep the peace. I also did a service change and 11 first floor outlets and she didn't have a problem with what I charged there. ($1,100 for 200a service change and 100 per for receptacles) I'll let y'all know how this comes out.

Although I do this part time, I am fully licensed, bonded and insured.

#44394 11/03/04 03:11 PM
Joined: Oct 2001
Posts: 597
E
Member
Big A,

An awful lot has to do with what local labor bill-out rates are. In my area it's $90 to $120 per hour.

Your customer, in my opinion, is getting a very fair deal.

My bread and butter is work in existing dwellings. 15 hours feels reasonable. From your description, I'll bet there was one overloaded circuit covering the second floor and now there are three distributed circuits, and grounding on top of that. Your work will have modernized, significantly, the second floor.

Regardless of what you get paid, the customer gets a permanent increase in the value of their property, and an electrical system that is more useful.


Al Hildenbrand
#44395 11/03/04 03:30 PM
Joined: Aug 2004
Posts: 54
G
Member
Big A,
with your clarification and ElecticAl's reasoning, I see you're right in the ballpark.

#44396 11/03/04 05:50 PM
Joined: May 2004
Posts: 697
D
Member
Baseboard outlets are a Pain-In-The-Butt!!!

Definitely time consuming over cutting a hole in drywall with a drywall knife. Was the attic cramped & nasty?

I think your price is very fair, but you didn't cover your butt, so it's time to negotiate & since you're done you don't have much negotiating power.

Put it in writing, ESPECIALLY with friends or relatives.

Dave

#44397 11/03/04 06:39 PM
Joined: Feb 2004
Posts: 494
M
Member
Hi,
Do what I do when this happens..give them a "NEW CUSTOMER" discount...say $20 off each..

That may help.

But next time get a deposit and a signed proposal!

part time or not.

-regards

Mustang