ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Safety at heights?
by gfretwell - 04/23/24 03:03 PM
Old low volt E10 sockets - supplier or alternative
by gfretwell - 04/21/24 11:20 AM
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 221 guests, and 7 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 2 1 2
#43831 11/01/04 10:32 PM
Joined: Jan 2004
Posts: 615
J
Member
Don't forget that just because the other guy can do it for that price, doesn't always mean that you can too. Just because one EC can squeek a small profit out at ($3??) per ft2, doesn't mean that at the same price you want the job to have a stab at turning a profit. You need to figure out what things cost you. Your labor, your materials, the brand cans you use, the fact that you terminate you phones to 66 block, the brand panel you put in. There are a lot of ways to cut corners on material.

Also many ways to cut corners on labor; don't pay overtime, use install methods that are quicker, yell "hurry" throughout the day, pay your men less, pay your men under the table, don't pay taxes, hire illegal aliens.

But the only way to really know if you will make a profit is if you know what your costs are. Your competition just may have a competative edge over you and be able to provide quality service and product at a price that yields a small profit for them that you would break even or lose money on. Or they may use methods that eventually catch up with them. I have watched these companies rise and fall, and now they no longer compete.

[This message has been edited by Jps1006 (edited 11-01-2004).]

#43832 11/02/04 10:38 AM
Joined: Mar 2004
Posts: 814
B
Member
OK I just finished a bid for a custom home. The total living area is 2850 then theres a 2 car garage and a motorhome garage. Total sq ft with garages is 5135. It's got a Whirlpool tub, 4 bathrooms, 4 bdrms, Kitchen island(slab floor), 1 floor receptacle, 13 hi hats, 28 GFCI protected receps, lots of 3 and 4 way switching, 11 ceiling fan outlets, 2 A/C units and 2 air handlers. The service is 200 AMP.
I used RS Means pricing and came up with $13,639, and $11,593 after applying my location factor of 85%.
This would put a sq ft avg at 4.06 on the living area, or 2.25 if I figured the total area, not including porches.
With the $13,639 figure the avgs are 4.78 and 2.65 respectively.
My post is not to prove anything but rather to gain insight from those more experienced in estimating.
All comments are welcomed.
B

#43833 11/02/04 12:34 PM
Joined: Nov 2004
Posts: 80
B
Member
BigB could you explain your RS Means pricing and location factor of 85%. I'm new at the bid game. I do reconize that it could be a cut throat world in the bid department. But I do not want to work for peanuts either. I feel that if I provide a fair market price, with good workmanlike manners, that my best calling card would be word of mouth by the homeowners.

#43834 11/02/04 08:33 PM
Joined: Apr 2001
Posts: 507
G
Member
"Does anyone still use $$/opening + panel&homerun + service riser + permitting?"

Yes, +HVAC

It's been so long since we did a house I'd have to go back and see what our price per opening would be. Somewhere in the $25-$30 range I'd guess. We are in a remote rural location and everything here runs less than average and way below the meto areas.

#43835 11/02/04 09:00 PM
Joined: Apr 2001
Posts: 449
F
Member
I price new home by the opening+service. Keep in mind I only do custom homes and rarely am bidding against anyone. Per opening price is $30.00 with NM boxes and $35.00 using steel boxes. 200A service w/o disconnect is $1200.00 w/disconnect is $1450.00. 320A service is $1600.00 using meter/main and MLO panels. All tin plated copper bus equipment(GE), no conductor smaller than #12, P&S CBR5352 recepts, spec grade switches. Zero call backs.

#43836 11/03/04 06:49 PM
Joined: Mar 2004
Posts: 814
B
Member
Bert,

RS Means makes books and software for the construction trades, including estimating products. They use a national average, then they provide adjustment factors for different localities. Try going to www.rsmeans.com

#43837 11/03/04 07:23 PM
Joined: May 2004
Posts: 697
D
Member
I do very little residential construction. I'd like to think that it has more to do with the greed of general contractors than my failure as an estimator (after all, if I was a failure as an estimator I would have starved a long time ago).

I didn't care for an estimating book that gave labor units for every connector, box, ring, wire, etc. Very tedious. I don't know if this one is similar, but I'd love to see a different format. They never allow for the manufacturer defects.

Some things I think about are:

Distance from job to truck...are you at the front door, or fifth truck to the job, halfway down the block?

How many other trades on top of you? "Hey Sparky, our saws tripped the breaker again!"...and laborers who don't watch where they're going & will hurt you as much as themselves.

Is it a five-day-to-rough job and the general wants it done in three days, so some OT is involved?

Just a few things to think about. Good Luck.

Dave

edited for spelling...again

[This message has been edited by Dave55 (edited 11-03-2004).]

#43838 11/03/04 07:57 PM
Joined: Feb 2004
Posts: 494
M
Member
Hi,
I have found that it is difficult to charge more than what the majority of ec's are charging.

One way to find out is to make a few phone calls and see if you can get some prices.

The market in your area dictates what you can charge. The home owner will undoubtedly hear of someone who will do it cheaper...i hear that a lot of times..

I have bid jobs every way known to man..the best are the ones for a sq. ft. price not by the hour or opening.. you can figure that anyway you want..by the opening, by the sq. ft. or by take off..but here is what will happen unless it is a spec house..there will be changes and additions to the job. You have to be a little flexible and include a minimum amount of phone cable and three ways..I have never seen a job that went off as planned..this is where the extra money is at...get a written contract/proposal that clearly states who can authorize changes.and what the hourly rate is for changes or a list of fees per opening extra switch etc....when they are requested submit a change order request and have them sign it then bill them after the final inspection if there is one.

I have seen $5K jobs go to $10K by doing good work, by suggesting items when the homeowner asks such as additional panels, service upgrades, recessed lights, outdoor lighting, etc.

a lot of money can be made in room additions and remodels.

I sometimes estimate the number of hours I think that I will spend on doing ANY WORK RELATED TO A JOB then estimate the materials..if I pay myself $45 an hour and the materials are $1000 and I spend 40 hours on the job then I can see doing that job will yield $1800 plus a grand in materials...now ask yourself is the work worth that $1800? If you can do a house in less than 40 hours for EVERY HOUR SPENT WORKING ON THAT JOB then you could see more dollars..I find it hard to think that you would actually spend 40 hours depending on the size of the home..if it is an average 2000 sq ft then $2 a sq. ft. will be $4K so that would be over twice as much money! I can sell $2 a sq. ft. better than $45 per hour...but if there is extra work then you can glean more hours from the job..

I try to stick with what the majority is doing.X DOLLARS PER SQ. FT. is the BEST WAY TO DO IT...most any general contractor will be glad to tell you what he's used to paying for spec or custom homes etc.

I have seen as low as $1.25 sq. ft. and as high as $4 per sq. ft..me I am in the middle..I have seen $35 an opening up to $50 an opening..

get as much as you can is the goal..as long as it is honest..do NOT pay under the table and do not fail to pay taxes..you will get away with it for a little while but it will catch up with you..

remember..the man who enriches others shall so too be enriched..

hope this helps..

-regards

Mustang



[This message has been edited by mustangelectric (edited 11-03-2004).]

Page 2 of 2 1 2

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5