Quote
Originally posted by sparky:
On a RX job, do you go straight into a box, or leave a service loop outside of it??

[Linked Image]
I'm not sure what you are talking about, but I'm guessing a rough-in job. Well, I would go straight into the box, because later (assuming you are talking about rough-ins)you will have to make-up your landed romex. By code, you must have 6 inches of conductor in the box (I think starting your measurement from the back of the box). Yet, I usually cut my wire at the wrist, after pushing a portion of it to the back of the box.

I hope this helps!