I was thinking the temporary service also, but the service will be supplying a propane tank and it already has 2 seal offs on the line in rigid pipe, and I'm not sure of the clearance from the tanks that I need for the service ( hadn't had time to dig in the code). If I leave the service where it is, the seal offs are already in place and all I would have to do is to divert it from the existing inside panel to an outside panel. I'm in process of seeing if the power company will change it to a single phase which will be a whole lot cheaper in labor and material etc.. Thanks for input
Don't guess anyone knows if clearances is an issue with the service? I'm not to much into hazardous wiring etc., but I can dig into the code to find out..