ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
UL 508A SPACING
by ale348 - 03/29/24 01:09 AM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (ale348), 302 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#215524 05/26/15 01:39 PM
Joined: Oct 2002
Posts: 830
S
Member
I have a customer that has an existing 3 phase service on a building that is going to be torn down. The only thing it is feeding that needs to stay is a 20 amp. 240 circuit that feeds a propane tank for campers etc. What we are thinking to do is set a weather proof panel beside the meter after the building is torn down and use the appropriate mounting. Think panel will have the 20 amp double pole in it and also a50 amp DP Circuit for a 240 volt outlet and a single pole breaker for a 120 volt outlet. My question is : I'll have total of 3 breakers. The smallest 3 phase 200 amp. WP Panel I can get is 18 circuit. I think this amount breakers would qualify for a main lug panel, but there are spaces for more. What would be your thoughts? Thanks

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Joined: Jul 2004
Posts: 9,923
Likes: 32
G
Member
I am not sure how the utility bills there but it might be cheaper in the long run to have them convert this to a regular single phase. The equipment will certainly be cheaper and I bet the service charges on the bill will be too.


Greg Fretwell
Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
A structure that is being demo'd requires all utilities to be disconnected and letters from each utility stating the disconnects have been done.

You would be better off IMHO installing a 'temp' service, single phase for the loads that are to remain.


Last edited by HotLine1; 05/27/15 11:30 PM.

John
Joined: Oct 2002
Posts: 830
S
Member
I was thinking the temporary service also, but the service will be supplying a propane tank and it already has 2 seal offs on the line in rigid pipe, and I'm not sure of the clearance from the tanks that I need for the service ( hadn't had time to dig in the code). If I leave the service where it is, the seal offs are already in place and all I would have to do is to divert it from the existing inside panel to an outside panel. I'm in process of seeing if the power company will change it to a single phase which will be a whole lot cheaper in labor and material etc.. Thanks for input
Don't guess anyone knows if clearances is an issue with the service? I'm not to much into hazardous wiring etc., but I can dig into the code to find out..