ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 263 guests, and 17 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#213719 07/02/14 02:07 PM
Joined: Mar 2003
Posts: 849
Y
Member
The location is a steep grade Mostly rock possibly 6 inches of dirt above the rock. Looking for best way to support a couple RSC raceways??? I'm thinking Elevated treated supports
Raceways attached to them with expansion joints as required.
One conduit LV controls other 480 volt power circuits.
Run up grade aprox. 300 to 400 feet .
Anyone run into this before???
Yoopersup

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
Yoop:
Back when....we drilled into the rock, epoxy in 3/4" s/s all thread, mounted 2-5/8 s/s strut and ran 4" galv on that.

Run was 250' +/- on about a 22 degree incline. As far as I know, it's still there.


John
Joined: Jun 2004
Posts: 1,273
T
Member
Is this in the Upper Peninsula?

The rest of Michigan is flat as a pancake!

RSC? It's not a term of art that we use out west.

Rigid Steel Conduit?

Snow and ice... are they issues?

If so, watch out for ice heave!

Ice can rip out just about anything. It must be avoided.

For my money: bury it or run it overhead.

Brutal terrain and conditions mean that the run can't be done on the cheap.



Tesla
Joined: Mar 2003
Posts: 849
Y
Member
Tesla
Yep Yooper!.
After looking at it many ways, Drilling poles into the rock. Want it to last more then a cpl. years.
Thanks for imputs
Yooperup


Link Copied to Clipboard