ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Safety at heights?
by gfretwell - 04/23/24 03:03 PM
Old low volt E10 sockets - supplier or alternative
by gfretwell - 04/21/24 11:20 AM
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 507 guests, and 40 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 4 of 4 1 2 3 4
harold endean #209107 03/07/13 10:43 AM
Joined: Apr 2002
Posts: 7,382
Likes: 7
Member
Shortcircuit:
Yes, modifications to buss cause issues with the listing. Alas, it has been 'common practice' for some time.

Dependent on having a PE/EE provide methods and materials, and a signed sealed drawing, it is acceptable in most cases.

A few jobs required the mfg to provide the materials and make the mods, and provide UL field certification. That is when $$$ is no object, as it it very costly


John
Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

harold endean #209250 03/19/13 12:23 AM
Joined: Jun 2004
Posts: 613
S
Member
bump Harold, how did this job work out?

harold endean #209303 03/23/13 11:52 AM
Joined: Feb 2002
Posts: 2,233
H
Member
I went back yesterday. I had a new set of drawings that showed the correct way it was all actually installed. There were some 800 amp quick blow fuses before the tap for the PV system. So the feeder to the PV was protected. They also didn't tap the bus, but bugged the incoming wires. II have signed and certified drawings from an EE for this job.

harold endean #209308 03/23/13 12:04 PM
Joined: Jun 2004
Posts: 613
S
Member
Originally Posted by harold endean
I went back yesterday. I had a new set of drawings that showed the correct way it was all actually installed. There were some 800 amp quick blow fuses before the tap for the PV system. So the feeder to the PV was protected. They also didn't tap the bus, but bugged the incoming wires. II have signed and certified drawings from an EE for this job.


Thanks for the follow up Harold.

The EE still has to follow the 120% rule.

harold endean #209752 04/23/13 12:02 PM
Joined: Jun 2004
Posts: 613
S
Member
bumpHow did this work out Harold?

harold endean #209805 04/29/13 01:19 PM
Joined: Feb 2002
Posts: 2,233
H
Member
Short circuit,


The EE did indeed follow the 120% rule and he marked it out on the new set of plans that he drew up.