ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 272 guests, and 15 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#207385 10/23/12 10:55 PM
Joined: Mar 2004
Posts: 814
B
BigB Offline OP
Member
230-2 states that a structure shall be supplied by only one service. We have an existing commercial building with two services on it. One service supplys the building to which the services are attached, the second service supplys a pedestal on an adjacent property. Both parcels are owned by the same company. The AHJ is refusing a re-connect stating 230-2. I don't see where 230-2 applies, the second service is supplying another structure (the pedestal, it is not supplying the same building as the first service. We do not have two services supplying one building.

Also, 230.3 states service conductors supplying a building or other structure shall not pass thru the interior of another building or structure. The load side conductors of the second service do pass thru the first building, but they are not "service conductors", correct?


Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

BigB #207386 10/24/12 01:19 AM
Joined: Jul 2004
Posts: 9,923
Likes: 32
G
Member
Where are the service disconnects?


Greg Fretwell
gfretwell #207387 10/24/12 01:33 AM
Joined: Mar 2004
Posts: 814
B
BigB Offline OP
Member
Originally Posted by gfretwell
Where are the service disconnects?


They are both on the first building, side by side.

BigB #207388 10/24/12 02:41 AM
Joined: Jul 2004
Posts: 9,923
Likes: 32
G
Member
Then I say there are 2 services brought to one building, sorry.
Maybe you can get a vote the other way here but the only one that counts is your AHJ.


Greg Fretwell
BigB #207391 10/24/12 11:08 AM
Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
Are there two (2) utility drops? IF there is one utility drop, or one UG lateral then IMHO it sounds like only one service.


John
HotLine1 #207401 10/24/12 10:06 PM
Joined: Mar 2004
Posts: 814
B
BigB Offline OP
Member
Originally Posted by HotLine1
Are there two (2) utility drops? IF there is one utility drop, or one UG lateral then IMHO it sounds like only one service.


Of course, I wasn't thinking since I was pissed off from dealing with the local bureaucracy. There is only one service, just two meter mains. Since I didn't show the drop on my drawing they probably thought there were 2 drops, or else they are just being stupid, and it is rubbing off on me. I will let you know what happens when I point this out. Thanks.

Last edited by BigB; 10/24/12 10:08 PM.
BigB #207404 10/24/12 10:31 PM
Joined: Jul 2004
Posts: 9,923
Likes: 32
G
Member
OK you are right, one service, 2 disconnects and a second building scenario.

It sounds like you just resubmit your plans, say sorry for the confusion and move on. wink


Greg Fretwell
BigB #207406 10/24/12 10:51 PM
Joined: Mar 2004
Posts: 814
B
BigB Offline OP
Member
Part of the problem is our new permit application system, we are using ProjectDox. It is nice in some ways that you can do everything from the office but like everything else on the internet it's not always the same as face to face.