ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (gfretwell), 32 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#200660 04/12/11 11:24 PM
Joined: Jun 2005
Posts: 17
M
MJ2000 Offline OP
Member
Hi,
I have to replace two direct buried light poles with surface mount (10'x4").Where can I find specification for the pole foundation(how deep does the hole have to be )? Does the Inspector have to check it before I pour concrete on?

Thanks,

MJ

MJ2000 #200667 04/13/11 01:20 PM
Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
MJ:

Specs for the foundation is from the manufacturer of the pole. Or, (here in NJ) a Lic. PE is required.

I can tell you here a electrical insp is required for the trench/conduit and the pole base, along with any supplemental grounding (lightning) & bonding.

Our members in Canada will get back with CEC & provincial regs.....


John
MJ2000 #200670 04/13/11 04:25 PM
Joined: May 2005
Posts: 984
Likes: 1
G
Member
You might have to ask a Strucural Engineer, depending on your circumstances.

The size and depth of the base is affected by the pole's height, how much stuff is on it (EPA=Effective Projected Area) and how windy it gets where you are.


Ghost307
MJ2000 #200672 04/13/11 06:52 PM
Joined: Jun 2006
Posts: 613
M
Member
Our Electrical installation department started buying and specing a precast base for all lamp and traffic standards.

For years we had used bolts and sonotubes with concrete but they take 28 days to reach full strength and often temporary traffic signals could be up for a month. Copper theft and other matters make this a poor choice.
I don't know what standard you are installing but the manufacturer should have a spec for the base and a bolt template for casting the foundation in place. Our stock bases are about 6 feet tall and shaped like a 4 sided pyramid. 4 feet across at the base and 1 foot across at the bolts.

Inspection rules fall under section 2 of the CEC and in provincial regulations which can vary from province to province. In BC it is the Safety Standards Act and the Electrical Safety Regulation that are the primary legislation governing electrical work.

These provincial acts can be found on the BCSA website.

In general an inspection is required for each phase of a job and before anything can be concealed whether by dirt or drywall.

A telephone pole has a 12 foot gain mark and depending on the length you must bury 1 meter plus %10 of the length of the pole. We use the gain mark to measure to ground level and subtract the above surface gain from 12 feet to determine if you buried the pole deep enough. Most pole contractors know this very well.

Last edited by mikesh; 04/13/11 06:56 PM.
MJ2000 #200685 04/14/11 01:30 AM
Joined: Jun 2005
Posts: 17
M
MJ2000 Offline OP
Member
Thanks for the suggestions,

The existing pole was three feet buried in the 12" sonotube.
The pole is between the houses(wind isn't an issue) with vertical load(50lb). I will ask for a manufacturer spec, they should provide it.

MJ