Recent Posts
Looking for a unique adjustment nut
by sparkyinak
02/09/12 02:16 AM
A taper or B taper, which is it?
by JoeTestingEngr
02/09/12 12:39 AM
GE low-voltage remote control relay system
by Albert
02/08/12 10:26 PM
Electrical systems in mobile structures.
by gfretwell
02/08/12 09:21 PM
Conduit Bending Apps for iPhone -Master Bender
by KJay
02/08/12 08:31 PM
New in the Gallery:
A What's right here??
Shout Box

Top Posters (30 Days)
gfretwell 72
HotLine1 66
KJay 34
sparky 28
renosteinke 26
Classified Ads:


Electrical-Classifieds.com

Who's Online
0 registered (), 96 Guests and 2 Spiders online.
Key: Admin, Global Mod, Mod
Page 4 of 4 < 1 2 3 4
Topic Options
Rate This Topic
#193146 - 03/19/10 09:56 PM Re: Transformer Secondary [Re: Scott35]
SJT Offline
Member

Registered: 07/24/02
Posts: 236
Loc: PATCHOGUE, N.Y.
Scott, Good drawings. Did you create those on Autocadd? Thanks

Top
#193162 - 03/20/10 01:05 PM Re: Transformer Secondary [Re: SJT]
Scott35 Offline

Broom Pusher and
Member

Registered: 10/19/00
Posts: 2553
Loc: Anaheim, CA. USA
SJT,

Yes, the drawings posted here at ECN were compiled within an AutoCAD Environment (drawn with AutoCAD).

BTW:
In regards to...
Quote:

I have to check the size of those Primary fuses, to make sure it's under that 125%.


Did you ever find out what size fuses were installed for Primary OCPD?

Let me know if there are any questions or comments.

Thanks for the reply. thanks beer

Scott
_________________________
Scott " 35 " Thompson
Just Say NO To Green Eggs And Ham!

Top
#193283 - 03/24/10 09:13 PM Re: Transformer Secondary [Re: Scott35]
SJT Offline
Member

Registered: 07/24/02
Posts: 236
Loc: PATCHOGUE, N.Y.
I have not checked the Primary fuse size, but I will. The Bldg. is only 2 years old, and the original design should of had 3 circuits to the cubicle sections. there are 2 sections we will be running an additional circuit to each. Learned a few things about cubicle pre-fab modular wiring on this one. Think I'll open a Sam Adams cold one.