ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
UL 508A SPACING
by ale348 - 03/29/24 01:09 AM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (ale348), 302 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Dec 2002
Posts: 308
E
Edward Offline OP
Member
I am working in a warehouse/production warehouse where the company makes wooden garage doors. There are many table saws,dust collectors,routers,sanders...Anotherwords it is a huge wood working shop.
What class is this location classified?
Class1,2 or 3?


Thanks
Edward
Joined: Jan 2002
Posts: 163
D
Member
prob. class II

(1999) 500-8 Class II Locations: 'are those that are hazardous because of the presence of combustible dust....see 500-8(a) & (b) for Div. 1 & 2 conditions.... Art. 502 then gets into the wiring methods for each division.

Joined: Jul 2001
Posts: 599
J
JBD Offline
Member
Normal saw dust is not enough to justfy a Class II environment.

We have a door manufacturer, down the road, and nothing in the production area is "explosion-proof" rated.

However, we let the local fire department determine all of our classifications.

Joined: Jun 2001
Posts: 161
M
Member
In our wood and metal shops we don't have any special requirements set by the Fire Marshall, but we take it an extra step and make everything NEMA 3 or better; no NEMA 1 enclosures. We do have dust collection and fume extraction, though.


Mike Wescoatt
Joined: Jun 2001
Posts: 642
N
Member
This depends on several factors Number of air changes/minute, is the dust collected and routed away from electrical equipment, layout of the equipment, etc.
This is why we ask the fire marshal to make the determination. They usually can get the designers to do all the engineering necessary to properly make the call. The fire marshal's office usually has a big enough hammer to get this done- if they care to.