ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
UL 508A SPACING
by ale348 - 03/29/24 01:09 AM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (ale348), 302 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#187110 06/13/09 11:28 PM
Joined: Jan 2005
Posts: 5,445
Likes: 2
Cat Servant
Member
Once again, I am starting a thread as a way to vent, to ponder 'what went wrong."

I'm new at the business side of thinks. A repeat customer has a 'side business' of managing a small strip mall. Unable to find a tenant for a large space, he is in the process of dividing the space into a hair / nail salon now, with a laundromat and sandwich shop to follow.

I managed to move myself from "shoe-in" to "frozen out" with this project.

When he mentioned 'hair/nail salon,' I spent several days examining existing salons, learning what their needs were. I then made a proposal based upon those lessons. I even brought in some HVAC guys to disxuss ventilation, etc. (which turns out to be a really big deal for a nail salon).

The customer then chats with his GC, who happily asserts that I am far too expensive, don't know what I'm doing, etc.

Work has begun. As best as I can tell, there is no permit, and the GC will do the plumbing, HVAC, and plumbing himself (though he is neither licensed nor qualified in these areas). Whether the GC has made any changes based upon the drawing I gave the customer remains unknown.

I'm staying clear of the place - not even looking in the windows. All I can do is trust to fate: that code compliance will learn of the job and shut it down, and that the GC's work will prove inadequate.

At last contact, the customer was relating the GC's plans for getting inside the switchgear and obtaining power for the proposed laundromat .....

I can't wait for the monthly IAEI meeting. I think I will strongly encourage the City folks to have lunch at the fast-food place next door, and just happen to notice something irregular going on. Any patience I may have is sorely tried at the mention of switchgear.

Latest Estimating Cost Guides & Software:
Joined: Sep 2002
Posts: 943
Likes: 2
N
Member
"I can't wait for the monthly IAEI meeting. I think I will strongly encourage the City folks to have lunch at the fast-food place next door, and just happen to notice something irregular going on. Any patience I may have is sorely tried at the mention of switchgear."

Nothing like a gentle "hint hint". grin

Joined: Feb 2003
Posts: 939
F
Member
Originally Posted by renosteinke


At last contact, the customer was relating the GC's plans for getting inside the switchgear and obtaining power for the proposed laundromat .....



Now That GC is getting nuts and that GC will not realized how big the service it require to run the landromat shocked plus HVAC requirement due the big dryers { you know how much those dryer can really move large quality of air plus gaz useage }

Merci,Marc


Pas de problme,il marche n'est-ce pas?"(No problem, it works doesn't it?)

Joined: Jun 2004
Posts: 1,273
T
Member
Spell it out...

Is it not true that the GC and landlord are free-riding on your design effort?

When a project is design-build...

You as EC need some boiler-plate protecting you from free-riding.

I'd start with copy-writing my submissions and establish ownership of the plans....

If, subsequently, the GC just happens to have followed the submitted design...

It's time for court.

I'd also tack on a liquidated damages clause to any design-build.

If the player wants to use submitted proposals then a fee for services rendered is due.

Free-riding is going to be the bane of D/B until some construct brings it to a halt.

------

Everyone: post your solutions.


Tesla
Joined: Jan 2005
Posts: 5,445
Likes: 2
Cat Servant
Member
Tesla, I understand your points ... and they're good ones! I only widh the GC was 'free-riding" on my plans; I'd have some faith in the design!

I had prepared a drawing based upon my intuition alone - I did not have a floor plan to work from. As it turns out, I got it 90% correct .... looks like I made some pretty good guesses.

The sketch later prepared by the GC is completely lacking several required items (such as egress lighting), relies upon existing lighting, and has all hair stations on the same circuit (two blow-dryers and POP!). Nor is there any ventilation added for the nail table area. I could go on, but I think you get the idea.

I'd sleep netter if only he were using my plan .... at least, I'd be confident that the tenant would be able to operate their business successfully.

As for plans in general .... if he ever submits plans to het a permit, he needs to have the electrical signed off by an architect, engineer, ot EC. The city will not accept his signature on the electrical, plumbing, or HVAC drawings.

Joined: Jul 2004
Posts: 9,923
Likes: 32
G
Member
Plans? Permits? ... on a commercial refit?
That would be strange to me.
I have seen entire data centers carved out of warehouse space and never went through plan review or permitting. That is one of the main reasons why IBM had installation planning reps.
Somebody needed to put some logic into the process, if for nothing else, to assure the proper operation of our equipment and safety of OUR employees.
It was a free service for most of the years IBM offered it as long as you were buying or leasing something new.
You could buy one tape drive and get your whole data center redesigned. We didn't have red tags but we could refuse to plug in our equipment or service it.


Greg Fretwell
Joined: May 2007
Posts: 169
C
Member
So has the GC burned himself up in the cabinet yet?
It sounds like your old client is in for a lesson himself.
Right after he learns it he will probably call you to come and make it work.