ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 162 guests, and 11 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 2 1 2
Joined: Jun 2007
Posts: 19
S
site351 Offline OP
Member
Tesla.......

Very informative post....
I will be estimating only the secondary feed wires and conduit...plus the Metered Pedestals on this project.
Sounds like you have some experience doing primary and all.
I spoke with the power company today and we have already
eliminated one transformer. Your right about the transformer
placement because they have them drawn close to the road where they could be rammed by someone. It would be nice to
relocate them near the back of the lots but they insist
it's hard to get trucks back there to change one out if need be.
I read your post carefully and....all the posts above.
I'm getting some good advice here and appreciate the comments....I like to learn and like the discussion terry


Last edited by site351; 04/28/09 11:55 PM.
Latest Estimating Cost Guides & Software:
Joined: Feb 2003
Posts: 939
F
Member
If i recalled right with one park the way the system set up for the weekenders that park did set up meterless power pedstel but for seasonal user they did set up with meter pedestail for that area.

the nonmetered pedestail what they did set up make a few multiruns of 200a rated conductors { typically 300KCM{150mm²}AL and the master breaker for that section is 1200 amp 1Ø with total of 6X 200's and each 200 amp " submain " breaker feed to 5 nonmetered pedestail group.
For metered verison there is master breaker there on the secondary conductor but right after the POCO transformer after that they ran in spur format { I don't recall excat number but I know it is over 25 total on that one }

Merci,Marc



Pas de problme,il marche n'est-ce pas?"(No problem, it works doesn't it?)