ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (CoolWill), 250 guests, and 13 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
Joined: Dec 2000
Posts: 4,294
Member
Posted for George Little:


Quote
I have a question that may not be relevant in all States but here in Michigan they just adopted a version of the energy code that affects recessed lights in the insulation envelope of a residence. Is it equivalent to use an air tight recessed can with a open trim and/or a IC can and a trim that has the letters "AT" in the model number. I have had no experience with either.
_________________________
George Little


Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Joined: Aug 2007
Posts: 853
L
Member
In Massachusetts,Yes. The 'AT' Is an enclosed fixture housing.
These must be used on the upper floors (attic) and between tenants (over under).

Joined: Feb 2003
Posts: 939
F
Member
I do know in State of Wisconsin do required AT { air tight } for any area where it will be in concat with insulating materals { it don't matter if batt or blow in type }
And in France they just adopted not too long ago as well for recessed cans I do belive they have few additonal code requirement as well.

Merci,Marc


Pas de problme,il marche n'est-ce pas?"(No problem, it works doesn't it?)

Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
Air tight cans with matching (AT) listed trims.



John
Joined: Jan 2004
Posts: 1,507
G
Member
The issue that I am asking about has to do with the contractors using IC cans and then using AT trims. The claim is that the trim gives them the required energy code requirements. I have to believe that the trims used on the cans need to be Listed for use with that can and vise versa. I think the installer should be using AT cans in the insulation envelope to comply with the energy code and the can should be finished off with an AT trim.


George Little
Joined: Aug 2007
Posts: 853
L
Member
The way I understand it (I'll research more),One or the other or both will meet the standard.

Not an Inspector.

Joined: May 2007
Posts: 169
C
Member
We've been ICAT here in CA since the October 2005 revision of Title 24.

I just heard tell of old partner installing all 80 IC (non-AT) cans in a new residence. As it turns out the inspector will let him fly with just AT trims.

I've used both since the revision not knowing I had an option.
Just as well as I like the finished product better.

Joined: Aug 2007
Posts: 853
L
Member
Still looking!

What a PITA. Ma Web sites.

Joined: Jan 2004
Posts: 1,507
G
Member
I'm still checking also Leland, I should be getting something kinda official from Cooper Industries (Halo Lighting) on the compatibility and interchange of their trims with the cans.


George Little
Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
George/Leland:

Went to Cooper/Halo website & poked around. I used the H7ICAT, and went to trims. 4 were on the spec page (trims) and 3 were OK for that can; 1 was not.

Looks like a spec sheet trail is going to be needed.

BTW, who checks to see if the gasket/caulk is properly installed after shtrock & before trims????

George, you're killin me


John