ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 255 guests, and 16 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#181975 11/13/08 03:00 PM
Joined: Apr 2002
Posts: 32
S
sudsy4 Offline OP
Member
I need some help! I have 8 sets of parallel 750 conductors that I have to splice outside, about 10 ft from a pad mount transformer, can anyone help me out with info on an above grade splice box for this application?


Bill
sudsy4 #181978 11/13/08 06:42 PM
Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
Bill:
More info please....
4" conduit? 8 conduits, 4-in, 4-out??

Entry points? side? back? straight?? opposing? 'U' pull ??








John
HotLine1 #181985 11/14/08 12:03 PM
Joined: Apr 2002
Posts: 32
S
sudsy4 Offline OP
Member
(8) 4" in (8) 4" out. Thinking of somthing like the utilities use, we call them coffin boxes, they have a base that the conduit come into from below and an above ground area for splicing.


Bill
sudsy4 #182114 11/18/08 10:20 PM
Joined: Mar 2001
Posts: 2,056
R
Member
They list an 8-port 500 kcmil, maybe 750 is available:

http://www.aplussupply.com/nsipolaris/polarisconnectors.htm

Then look here:

http://www.quazite.com/?gclid=CMu15Z38_5YCFQpJtAodCmw3ZA


But you knew this laugh

Redsy #182120 11/19/08 12:04 AM
Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
Redsy:
Nice job on the links!

I think the OP is looking for something like a PSE&G pullbox (coffin) AND something 'above ground' to splice in.

The PSE&G spec is precast concrete, 4' deep, 4' wide and 71/2' long. 4 over 4 in and out works nice.

Take care


John
HotLine1 #182178 11/20/08 11:52 AM
Joined: Apr 2002
Posts: 32
S
sudsy4 Offline OP
Member
Thanks for everyones input. I found what I need at Nordic Fiberglass, Inc. Comes complete with 4 sets 0f 24 pt 750 lugs.


Bill
sudsy4 #182193 11/20/08 09:57 PM
Joined: Jan 2005
Posts: 316
L
Member
The company I used to work bought custom made boxes from a fab shop. This fab shop - all they did was make metal troughs and boxes. Indoor or outdoor. They even provided POCO approved CT Cabinets for less $$ then the POCO.
I was told "if you draw it out and / or explain it to us - we can make it for you"
I put them to the test too. I had some interesting troughs made!
Might be worth the search to see if such a thing exists in your area.

luckyshadow #182211 11/21/08 07:09 AM
Joined: Jul 2002
Posts: 8,443
Likes: 3
Member
Originally Posted by luckyshadow
The company I used to work bought custom made boxes from a fab shop. This fab shop - all they did was make metal troughs and boxes. Indoor or outdoor. They even provided POCO approved CT Cabinets for less $$ then the POCO.
I was told "if you draw it out and / or explain it to us - we can make it for you"
I put them to the test too. I had some interesting troughs made!

Good stuff Ken,
When I was doing dairy stuff we always fabricated our own Stainless steel "enclosures", all you need is a sheet bender, a clue as to what you are doing and a TIG welder to close up the sheet joints and make the thing water-proof and look nice, of course.
Most fabrication places are only too happy to build a one-off provided they get good plans of what you want and a time frame of when you need it.

My only reservation would be, would an independent enclosure be " UL listed" at all?
Would it need to be?

Trumpy #182220 11/21/08 10:21 AM
Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
I have used custom troffs (wireways) when needed, fabed by a shop that also made switchgear and panelboards. Excellent end results, based on field dimensions. He was very cooperative and performed all field measurements. UL labeling was not an issue, all equipment was labeled.

The sticky side was...$$$$. Not a source if you had budget constraints.

Mike (Trumpy) did you do the fab yourself? Or do you have a welder and bender on staff?