ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Safety at heights?
by gfretwell - 04/23/24 03:03 PM
Old low volt E10 sockets - supplier or alternative
by gfretwell - 04/21/24 11:20 AM
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 519 guests, and 42 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 2 1 2
Joined: Jul 2002
Posts: 8,443
Likes: 3
Member
What a long way we've come in the last few years.
When I served my time as a Line Mechanic, we used to take 33kV (delta) from the Trans-Power Grid and that was stepped down to 11kV for local distribution (as in 400/230V).
These days we are taking off from Trans-Power at 66kV and having step-down voltages (all delta) of 33, 22 and 11kV.
We now have the problem that if there is a serious fault on one of our feeders, to actually sectionalise a certain part of our local network, will to a degree unbalance the Trans-Power feed, it means that there will be at any given time during a fault, at least 3 faults trucks going backwards and forwards to correctly re-energise the lines in a certain sequence.
It's annoying and it usually happens in the early hours of the morning, when all the dairy sheds start milking.

Arc Flash PPE Clothing, LOTO & Insulated Tools
Joined: Mar 2008
Posts: 144
Member
Originally Posted by dougwells
Truly a sad thing for his young Friends to deal with and remember. I sure hope there is some support for his buddies to deal with this.



i agree, and my condolences out to the family


-Joe
“then we'll glue em' then screw em'”
-Tom Silva
TOH
Page 2 of 2 1 2

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5