ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Safety at heights?
by gfretwell - 04/23/24 03:03 PM
Old low volt E10 sockets - supplier or alternative
by gfretwell - 04/21/24 11:20 AM
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 516 guests, and 17 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 2 1 2
Joined: Mar 2003
Posts: 849
Y
Member

240.21 (B)(1) (4) For FIELD installations where the Tap conductors Leave the Encloser in which the tap is made The rateing of the overcurrent device on the LINE side of the Tap conductors shall not EXCEED 10 times the Ampacity of the tap conductors. Under this you can make a 100 amp (10 ft conductor tap) off a 1000 amp protected gear. The handout we Received on 6/19/08 Prog. # 14193 at the Michigan IAEI meeting covers this quite well.
Also see 240.90 For (Supervised Industral Installations)
If the area falls under that.

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Joined: Jan 2004
Posts: 1,507
G
Member
Ernie- Read the original post again- I read it to be a transformer secondary tap and the code reference you referenced to 240.21(B)(1)(4) is a tap to a feeder. Maybe I'm wrong.

The post doesn't indicate whether or not it is a Supervised Installation.

Last edited by George Little; 08/31/08 09:58 PM.

George Little
Page 2 of 2 1 2

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5