ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 276 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
Joined: Jul 2004
Posts: 9,923
Likes: 32
G
Member
What kind of box do you all recommend for setting boxes in a concrete block wall, fishing the raceway down the cores. There will be a stucco/plaster finish. Dry location


Greg Fretwell
Joined: Mar 2004
Posts: 814
B
Member
Greg, I always use Mason boxes. They are made in both deep and shallow. A true mason box has a lip across the top and bottom for securing the device. I mount them flush or out a little to allow for the stucco. If the stucco is to have styrofoam insulation behind it, then I fasten a handy box extension to it to make up the 1 to 1.5" difference.

Unfortunately, setting boxes in concrete/block/brick is a common thing where I live, I keep a box of Mason boxes on the truck, along with a box of rapid set mortar, and a box of 20 min drywall compound.

Last edited by BigB; 05/01/08 10:32 PM.
Joined: Jul 2004
Posts: 9,923
Likes: 32
G
Member
Thanks, I was hoping somebody had come up with a new idea that didn't involve mud.


Greg Fretwell
Joined: Sep 2004
Posts: 68
H
Member
Greg,
The corregated plastic flex is a little easier to fish if you need a raceway, rather than metal flex. It also does not corrode like aluminum can in high moisture environments.

Joined: Jul 2004
Posts: 9,923
Likes: 32
G
Member
I am using ENT, I assume that is what you are talking about, since it will be cast in concrete at the top of the wall.
We need tie beams here.
I guess masonry boxes it is. I was just amazed that someone had not come up with a surface flange box deep enough to get the KO behind the block web. I sure couldn't find anything in the catalogs


Greg Fretwell
Joined: Jul 2004
Posts: 9,923
Likes: 32
G
Member
Just a thought, could you "foam" the boxes in?


Greg Fretwell
Joined: Oct 2006
Posts: 745
E
Member
Greg:

I'm surprised that Arlington Industries hasn't come out with a solution for this yet. This is about the closest thing that I can think of that would address your type of installation, but it's a round box: http://www.aifittings.com/whnew102.htm


---Ed---

"But the guy at Home Depot said it would work."
Joined: Jul 2004
Posts: 9,923
Likes: 32
G
Member
OK I am just going with the regular mason boxes and I will just pour these cells when they do the tie beam and dowelled cells. I am going to cut some plywood squares to hold the boxes straight while they get poured in.


Greg Fretwell
Joined: Jun 2007
Posts: 301
J
Member
Can you be there when the block masons are doing the wall. If so you can set the boxes where you want and let them cut them in as they go. You can even run your conduit along with them if they agree. If you don't have to many walls to cover this has always worked good for me.
I use regular 1900 boxes with masking tape.

Joined: Jul 2004
Posts: 9,923
Likes: 32
G
Member
We are doing a delicate dance with the masons to get this done as easy as possible for them because they are doing me a favor. I would rather work when they are not here so I don't interrupt the flow of their work. I made up some plywood fixtures to hold the boxes with witness lines across the device mounting holes so I can chalk a vertical on the wall and get everything to be straight and level. I will saw cut holes, stuff the pre-piped boxes down the cores and attach them to the plywood via the device holes then tapcon the whole wood to the wall over the hole. When they pour the cells I should have boxes concreted in and sticking out 3/8" for the stucco. It took a while to make my plywood fixtures but it was more fun that watching 3 guys chip out 4 yards of concrete (the current step).