ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
2 members (Scott35, ampherder), 273 guests, and 12 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#177393 05/01/08 12:45 PM
Joined: Jun 2007
Posts: 301
J
JValdes Offline OP
Member
If I install a meter load center (meter can and breaker combo) can I use a lug panel for the main service panel?

Joined: May 2007
Posts: 47
B
Member
The meter combo IS the main service panel.
The panel on the inside will be a 'sub' panel; assuming it is fed from a breaker in the outside panel.
And don't forget to pull a ground too. wink

I'd still use another main panel inside though.


Design-Build isn't supposed to mean design *as* you build.
Joined: Oct 2006
Posts: 745
E
Member
I doubt that I'd install a main in the sub panel since it is within the same building. Still, those panel packages that come with a main PLUS a selection of breakers are sometimes less expensive than buying a MLO panel and the same breakers that come with the package. Kind of hard to argue at that point.

A 100 amp MB panel with five SP 20 amp breakers (Square D Homeline) is only $60.00. In that case, the customers are getting a main breaker whether they need it or not.


---Ed---

"But the guy at Home Depot said it would work."
Joined: Jun 2007
Posts: 301
J
JValdes Offline OP
Member
Thanks folks, that clears that up.....John