i usually leave mondays open for various unplanned disasters....
|
|
|
|
Joined: Nov 2000
Posts: 2,236 Likes: 1
Member
|
Going to try to finish a trim-out (if all the stuff is there...) I'm in the "gotta finish one of these jobs so I can get paid" mode. Been spreading myself pretty thin lately... (I did take three days off for Thanksgiving, and only worked three hours on Friday).
May have my new helper wth me, he passed his test with a 93% (I think he said). His old job is still a few days behind due to the weather, so he won't be available just yet, weather permitting.
Plenty of work, and it could easily explode into more...
Then again, the bottom could fall out of the whole thing!
Part of the biz...
-Virgil Residential/Commercial Inspector 5 Star Inspections Member IAEI
|
|
|
|
Joined: Oct 2002
Posts: 210
Member
|
Barring any emergencies, I continue roughing in a small but detailed single family guest dwelling.
|
|
|
|
Joined: Aug 2002
Posts: 47
Member
|
I have three things planned for Monday. First is to install some breaker locks and a sign for a main shunt trip on a store I remodeled. This will finish the job. The fire marshall is comming for his final inspection on Monday as well. The store is about a 45 minute drive one way from our shop.
From there I need to finish rewiring an ansul system I started last Wednesday but didn't finish. It is in a nursing home on the other side of town.
The last thing I have going is I need to locate a break in the underground feeder for the weather equipment at the local airport. The service is located on one end of the airport property and the equipment is about 1500 feet away. I didn't have time on Wednesday to really do more than troubleshoot the problem. Will have to go back with a cable tracer to locate and repair the break.
I was off on Friday, had a nice four day weekend.
|
|
|
|
Joined: Apr 2001
Posts: 507
Member
|
"i usually leave mondays open for various unplanned disasters...."
Is that pesimism or realism???
GJ
|
|
|
|
Joined: Apr 2001
Posts: 507
Member
|
"I've got 2400' of 500mcm on Tuesday if you wanna trade. "
No thanks, my back is starting to hurt just thinking about it.
GJ
|
|
|
|
Joined: Oct 2000
Posts: 2,723 Likes: 1
Broom Pusher and Member
|
Supposed to be starting a Residential Service Relocation / Upgrade soon, so maybe Monday if no rain!?!?!
IAEI Division Meeting on Tuesday [my first!].
Site meeting Thursday AM for a Dentist Office I am doing the Electrical Designing / Engineering on [first Dentist Office to EE!].
Between the Service Upgrade and the DDS Office Injun-Ear-ring [Engineering], have some free time to post things to ECN's Tech Ref section! At least for 2 weeks!
Scott s.e.t.
Scott " 35 " Thompson Just Say NO To Green Eggs And Ham!
|
|
|
|
Joined: Aug 2001
Posts: 466 Likes: 1
Member
|
Packing up my tools and trying to finish all the loose ends before moving. The movers come Tues. AM. Wednesday, walk-thru on the old place and a AM and PM settlement.
Thursday, "Where did I put that? Friday, I hope to be back to work.
|
|
|
|
Joined: Apr 2002
Posts: 7,381 Likes: 7
Member
|
Well, let's see... Crew #1: Parking Lot Lighting Service at one shop ctr. And, hang holiday decorations at one center. 15' wreath @ 55' AFF; "Holiday Greetings" script, (6'x 30' made from rebar) @25'AFF.
Crew #2: 2-45KVA xfrs; 2-480 panels, 4-15KW elec. heaters, and then they can go back to the hi-bays (HA)
Me: Appt for 30k SF building purchase inspection. Then the Doc ??; Ck Crew 2; PU Contract for upcoming job; order a few poles and fixtures....whatever else I can squeeze in....then from 5:00 to 9:30 I have an inspectors CEU Class (Mon & Wed for DEcember) Then if I stay awake, some paperwork at the office/home. John
John
|
|
|
|
Joined: Jun 2001
Posts: 642
Member
|
Golf junkie DO you have a tugger? This monday and tuesday are open due to the carpenters not having the house dried in. Email me