#175910 - 03/14/08 12:00 PM
Re: 'Temporary' Transformer Hookup
[Re: Webmaster]
|
Member
Registered: 07/05/04
Posts: 649
Loc: Winchester, NH, US
|
Is that a breaker panel that reaches all the way down to the floor? It looks like the bottom breakers are only 12" from the floor.
Larry C
|
|
Top
|
|
|
|
#175939 - 03/15/08 10:35 AM
Re: 'Temporary' Transformer Hookup
[Re: LarryC]
|
Member
Registered: 07/08/07
Posts: 867
Loc: Alaska
|
Customers are willing to pay a high price to be cheap. Years ago, a couple of co-workers went to investigate a transformer at a foundry. It was a oil filled can like the POCO's use on poles. The lid blew off and half the oil boiled off and the customer wanted to know if they can keep running it that way. I do not believe they were running 24/7 operations at the time. They just did not want give up the money. Even when money is tight, you think it was a no brainer.
_________________________
"Good judgment comes from experience. Experience comes from bad judgment."
|
|
Top
|
|
|
|
#175940 - 03/15/08 10:36 AM
Re: 'Temporary' Transformer Hookup
[Re: LarryC]
|
Member
Registered: 08/20/07
Posts: 856
Loc: Lowell area, Ma. USA
|
Mike, A world renouned college, Known for its Engineering wonders of the world. (Big dome )
This is a distribution panel for 120/240 lab panels a and class rooms. RE; shut down, your right. The bottom line is they don't want to pay OT!!.
Larry, we have the 12" at the bottom.
This is a 225 KVA 480-240. My surprise, 2002!!!! 6 YEARS!!! I guess their priority is the students.
|
|
Top
|
|
|
|
#175941 - 03/15/08 10:38 AM
Re: 'Temporary' Transformer Hookup
[Re: leland]
|
Member
Registered: 07/08/07
Posts: 867
Loc: Alaska
|
I work for the government. 6 years is still considered temporary. 
_________________________
"Good judgment comes from experience. Experience comes from bad judgment."
|
|
Top
|
|
|
|
#175942 - 03/15/08 10:56 AM
Re: 'Temporary' Transformer Hookup
[Re: sparkyinak]
|
Member
Registered: 08/20/07
Posts: 856
Loc: Lowell area, Ma. USA
|
I work for the government. 6 years is still considered temporary.  You aint kidding!! Temporarily permanent!
|
|
Top
|
|
|
|
#175981 - 03/17/08 02:18 AM
Re: 'Temporary' Transformer Hookup
[Re: leland]
|
Member
Registered: 12/17/01
Posts: 2115
Loc: Vienna, Austria
|
In Austria they say temporary solutions usually last longer than permanent ones... in 1892 the city built a temporary subway station (temporary becaus it was close to a bridge scheduled for a major redesign and they planned to build the permanent station after the bridge work was completed). The temporary station lasted until about 1960... the permanent station built afterwards was demolished again in 1978. So that makes 68 years for the temp solution and 28 for the permanent... nice, huh?
|
|
Top
|
|
|
|
#176082 - 03/19/08 07:58 PM
Re: 'Temporary' Transformer Hookup
[Re: leland]
|
Member
Registered: 08/13/05
Posts: 214
Loc: Seattle Washington USA
|
Considering the U I think this is, it makes it all the more funny, not exactly an engineering or technological masterpiece.
-Will
|
|
Top
|
|
|
|
#176095 - 03/20/08 09:58 AM
Re: 'Temporary' Transformer Hookup
[Re: leland]
|
Member
Registered: 03/19/05
Posts: 1192
Loc: Chesapeake, VA
|
Mike, A world renouned college, Known for its Engineering wonders of the world. (Big dome )
This is a distribution panel for 120/240 lab panels a and class rooms. RE; shut down, your right. The bottom line is they don't want to pay OT!!.
Larry, we have the 12" at the bottom.
This is a 225 KVA 480-240. My surprise, 2002!!!! 6 YEARS!!! I guess their priority is the students. I've see the same situation more times than I care to count... our problem isn't cost though (well, not always) but unwillingness to schedule downtime. Hey, power's still flowing so it might be OK, right??
|
|
Top
|
|
|
|
#176097 - 03/20/08 11:36 AM
Re: 'Temporary' Transformer Hookup
[Re: SteveFehr]
|
Member
Registered: 04/30/04
Posts: 826
Loc: Lower Bucks County PA
|
Yeah, "It must be okay!" the boss/director says, then POOF, lights out. All the sudden it becomes an emergency, when it should have been repaired months/years ago!
Ian A.
_________________________
"Hey no wonder the water don't woik, the pipe is plugged up with wires."
|
|
Top
|
|
|
|
#176105 - 03/20/08 12:56 PM
Re: 'Temporary' Transformer Hookup
[Re: leland]
|
Member
Registered: 08/11/01
Posts: 7693
Loc: Norfolk, England
|
I work for the government. 6 years is still considered temporary.  You aint kidding!! Temporarily permanent! Ain't that the truth? British income tax was introduced as a temporary measure -- Two hundred years ago!
|
|
Top
|
|
|
|
#176120 - 03/20/08 06:43 PM
Re: 'Temporary' Transformer Hookup
[Re: leland]
|
Member
Registered: 08/20/07
Posts: 856
Loc: Lowell area, Ma. USA
|
|
|
Top
|
|
|
|
#178486 - 06/01/08 02:07 PM
Re: 'Temporary' Transformer Hookup
[Re: leland]
|
Member
Registered: 07/05/04
Posts: 615
Loc: Palo Alto, CA, USA
|
M.I.T. Edited out copyrighted image.
Edited by SolarPowered (06/01/08 02:11 PM)
|
|
Top
|
|
|
|
#178509 - 06/02/08 04:49 PM
Re: 'Temporary' Transformer Hookup
[Re: leland]
|
Member
Registered: 11/29/02
Posts: 704
Loc: Oradell NJ USA
|
Mike, A world renouned college
This is a distribution panel for 120/240 lab panels a and class rooms.
This is a 225 KVA 480-240. My surprise, 2002!!!! 6 YEARS!!! I guess their priority is the students. So this mess has been there before last year's graduating class of 2007 came in as freshmen (fall 2003).  And it's not like that there's no periods of down time that this could have been taken care of. Like Spring Break, or the Summer. 
|
|
Top
|
|
|
|
|
|