ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 373 guests, and 12 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Mar 2003
Posts: 849
Y
Member
Run from Transfer Switch to a Life safety Panel. I see no reason why you can't Sub feed to another Life Safety Panel??
Same with critical Panel subfeeding another Critical panel.


Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Joined: May 2002
Posts: 1,716
R
Member
Originally Posted by Yoopersup
Run from Transfer Switch to a Life safety Panel. I see no reason why you can't Sub feed to another Life Safety Panel??
Same with critical Panel subfeeding another Critical panel.



Absolutely.

Roger

Joined: Aug 2007
Posts: 853
L
Member
Agreed. Stay within the same "system".


Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5