ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (gfretwell), 32 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
#174010 01/25/08 12:22 AM
Joined: Aug 2007
Posts: 853
L
leland Offline OP
Member
Hi All,I know we have some HV and utility guys here so I thought I would ask.
I was doing a PM today on some equipment (unrelated), when I took a look at a G&W 4 POSITION SWITCH. 2300v.
I noticed the cables in the 4" conduit. They are terminated and bonds are all made up and bonded to the G&W cabinet. Fine.
My question is: should the the conduits be bonded to the cab aswell? Now the cables just come out of the pipe with no fittings.I thought it strange/odd there was no bond to the conduits.

Thanx, Lee

(I can post pics)

leland #174015 01/25/08 04:54 AM
Joined: Jul 2002
Posts: 8,443
Likes: 3
Member
Hi Lee,
There might need to be some testing done before the work was completed.
Likes of a Hi-Pot test or what-ever.
The reason the terminations are made like that before all the mechanical stuff is finished is pure economics, maybe the test technician could only be at that site at that time.
Sure, we would all like to have things finished, I've tested work in sub-stations here where the engineering part has not been completed, but is safe.
Commissioning HV gear is in itself a long slow process.

Trumpy #174057 01/25/08 08:23 PM
Joined: Mar 2003
Posts: 849
Y
Member
If HV cable Shields bonded both ends cable must be derated
310.60 (C) 1
Conduits must be bonded as usual

Yoopersup #174077 01/25/08 11:48 PM
Joined: Aug 2007
Posts: 853
L
leland Offline OP
Member
AAAARGGG. I'm so stupid!!!!!
I'll try to post a pic of my question.

Thanks folks, It must be hard to determine what "morons" like me ask.


leland #174080 01/26/08 12:40 AM
Joined: Dec 2002
Posts: 228
J
Member
I think what leland is trying to say is the hv cables come in and are terminated as usual, but the conduit they are in has no connector on it and is not bonded to the cabinet.

Did I get that right?

JCooper #174086 01/26/08 09:46 AM
Joined: Aug 2007
Posts: 853
L
leland Offline OP
Member
Perfect!

leland #174097 01/26/08 04:02 PM
Joined: Dec 2005
Posts: 869
Likes: 4
R
Member
The conduit you mean is the screen of the cable ?

Most HV cables have a armour and a screen around the 3 core cable or a screen around each individual core.

A photo would be nice.


The product of rotation, excitation and flux produces electricty.
RODALCO #174098 01/26/08 05:23 PM
Joined: Jul 2002
Posts: 8,443
Likes: 3
Member
Here's the picture:

[Linked Image from electricalphotos.com]

Trumpy #174111 01/26/08 10:59 PM
Joined: Aug 2007
Posts: 853
L
leland Offline OP
Member
Thanks for the photo Mike.

Basicaly behind the sheet metal cover, all the boots are made up and the sheilds terminated and bonded to the frame.
However the conduits are not bonded to the frame (just filled with sealant to keep the water from man holes out).
I would think they should be.

leland #174131 01/27/08 11:22 AM
Joined: Mar 2003
Posts: 849
Y
Member
Try 250.190 2005 nec