ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
UL 508A SPACING
by ale348 - 03/29/24 01:09 AM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (ale348), 302 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#171424 11/27/07 10:59 PM
Joined: Jun 2007
Posts: 106
M
Member
Hello, can someone tell me what it means to choke a transformer and the theory behind it. When would you do this and why?


Never trust an electrician with no eyebrows!!
Joined: May 2005
Posts: 984
Likes: 1
G
Member
The OCP requirements give the maximum rating that can be used to protect a transformer.

In the case of a recent design here, the load was just beyond the capacity of a 300KVA transformer, but the next size is 500KVA.
In order to avoid the costs and physical size of the OCP on both sides of the transformer, it was fused at something less that the Code maximum. Since that will also limit the secondary side current, the smaller distribution equipment can be used on that side as well. I rarely choke a transformer, but sometimes the big jump in sizes for the big ones get to be problems. In this case, I would have needed a 350KVA transformer (if anybody sold one), but I was able to choke a 500KVA without having to use the maximum OCP sizes in the design.


Ghost307