ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 248 guests, and 16 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Oct 2000
Posts: 3,682
Likes: 3
Admin Offline OP
Administrator
Member
Quote
Why call an electrician, I can brick right around it! The same guy must have done both.

- HCE727

[Linked Image]

[Linked Image]

[Linked Image]

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Joined: Aug 2007
Posts: 61
Member
I think that brick layer has probably used up his 8 of 9 lives.


~Matt


I would rather beg for forgiveness then beg for permission.
Joined: Dec 2005
Posts: 152
A
Member
While this is clearly problematic - the bricklayer is not completely at fault - he arrives on day one to complete the job - the site is not prepared and he has other jobs lines up for tomorrow. This should have been taken care of by the owner BEFORE the bricklayer arrived.

Joined: Oct 2002
Posts: 482
Z
Member
Good point Ann, but he should have refused to perform the work in the interest of his own safety. Next time I run across a mason with extra curly hair...

Joined: Nov 2005
Posts: 507
M
Member
Originally Posted by Ann Brush
While this is clearly problematic - the bricklayer is not completely at fault - he arrives on day one to complete the job - the site is not prepared and he has other jobs lines up for tomorrow. This should have been taken care of by the owner BEFORE the bricklayer arrived.


ok, so the rule is...if someone else doesn't do what they are supposed to do, I can do something completely stupid and dangerous...

it that correct? just want to make sure...cause, boy will that rule save me a bunch of time each day...

Joined: Nov 2002
Posts: 794
Likes: 3
W
Member
Maybe the bricklayer had heard of the use of concrete around a conduct that has service wires without over current protection inside a building from the power company, to make it "not inside the building". And thus he figured that bricks are equivalent, and that what he did would be appropriate. He should have left the head open, though... eek

Last edited by wa2ise; 09/22/07 04:59 PM.
Joined: Aug 2007
Posts: 853
L
Member
800-Brick Brazilion. Get Er' Done!
Do you realy think the owner cares?

Not until the "Good hands" people call.

Then Uncle steps in and................... I Digres, sorry.