This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 265 guests, and 15 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#163265 05/04/07 11:58 PM
Joined: Mar 2004
Posts: 814
B
BigB Offline OP
Member
Anyone ever work with Gypcrete? A customer wants a floorbox installed in some existing Gypcrete. Will it cut easily with a dry diamond blade? Anything I should know first, besides if there is a hydronic system in it?

BigB #163272 05/05/07 07:36 AM
Joined: Sep 2005
Posts: 421
Member
are you going to need some sort of fire stop ?


Tom
togol #163277 05/05/07 12:00 PM
Joined: Jan 2005
Posts: 5,445
Likes: 2
Cat Servant
Member
Gypcrete cuts the same as any other cement product; a little harder, a little dustier, no aggregate or rebar to speak of.

It's usually poured in a thin layer (less than 2") over normal concrete.

The most common use is to obtain a particularly flat, or specifically sloped, surface. It's often used to 'correct' a bad pour ... or, as you suggested, for embedding heating tubes.

renosteinke #163288 05/05/07 02:24 PM
Joined: Jul 2002
Posts: 717
M
Member
The other frequent use of gypcrete is to provide a fire retardant barrier to wood constructed multifamily dwellings between units constructed one above the other. I agree about it is harder to drill than standard concrete. The fire stopping question by another poster is something to consider if this is the type of install you are encountering.

macmikeman #163302 05/05/07 09:38 PM
Joined: Mar 2004
Posts: 814
B
BigB Offline OP
Member
There are already floor boxes installed at construction. I assume they poured the gypcrete around them. One of them is not where they want it. I thought if I patched with a gypsum based product, it would serve the firestopping purpose.

BigB #163311 05/06/07 07:50 AM
Joined: Sep 2005
Posts: 421
Member
....... blank that one up and install a new box where they want it.

explain that you don't really want a soft spot in their concrete floor, or you may end up with another problem later


Tom
togol #163349 05/06/07 11:47 PM
Joined: Mar 2004
Posts: 814
B
BigB Offline OP
Member
thanks thats a good idea. Funny thing I spent a lot of time searching for Gypcrete repair and cutting info on the web and came up empty handed. Also, no one I have asked about it even knows what it is, including two general contractors and half a dozen Helpful Hardware Guys. It is being poured here on the big condos.

BigB #163538 05/09/07 11:41 PM
Joined: Mar 2004
Posts: 814
B
BigB Offline OP
Member
Here's an update on the Gypcrete. It was barely 1" thick and poured over a 3/4" chipboard subfloor supported by gluelams every 12 inches. It was extremely easy to cut, I cut it with my recessed can hole saw. You could carve it out with a screwdriver if you wanted. I was able to remove the Romex from the unwanted box and fish it to the new box, which I supported by fastening a 2x4 platform between 2 gluelams. First I fastened two pieces flat against the gluelams then placed the platform across them.

I cut the old box off flush, then filled it with a gypsum based concrete patch, patched my holes and filled in around the box. Job done and fire rating intact.

It was way easier than trenching a slab.

BigB #163564 05/10/07 06:53 PM
Joined: Sep 2005
Posts: 421
Member
Good , glad it worked out for you


Tom